New Tasks
Weigh parts to check with CAD
figure out A4 sqeezing and backlash
have to prevent A3 backdriving first - temp fixture to block motion?
test fixture for A6 individually?
Current load for A5 is 11A, pretty high
test gimbal
need zed 2
test with another camera? zed 1?
Arduino board stuff needs to be programming
get current sensors working
get encoder data
position control
get IK working - mid September
test repeatability
get hard numbers
COMPARE PHYSICAL DESIGN WITH CALCULATED DESIGN
General Notes
lower amperage for the arm