2021-12-23 Meeting Minutes - Drivetrain
MACHINING & ASSEMBLY-READY SUB-SYSTEMS DUE JAN 4TH!!!
Goals
- Review the state of each sub-system and what's left to do
- Delegate if necessary
- Review member availability next term
Required Items
- Final CAD → parts are ready to be machined, tolerances are in, fasteners are in, does not break the main assembly
- Please upload to GrabCAD

- Please upload to GrabCAD
- BOM!!!
- 1 BOM for assembly drawings, another BOM (excel) for Emily purchasing
- Part drawings
- Priority is Demtool drawings. Send for review as soon as they're done
- Make bonding tubes drawings without the step-down
- Make a drawing for every part we're getting machined. Carbon fibre tubes can be put into the same drawing file, different sheets
- Assembly drawing
- The goal is to make this detailed enough that someone not familiar with your sub-system can assemble it without you there
- Reference axis 1 assembly drawings
Update & Action Items
| Member | Update | Action Items |
|---|---|---|
| Former user (Deleted) (Chassis) |
|
|
| Former user (Deleted) (Wheel connections) |
|
|
| Emily Adam (Deactivated) (Differential bar) |
|
|
| Former user (Deleted) (Frame/structure) |
| |
| Former user (Deleted) |
| |
| Elizabeth Jung (Deactivated) (Bonding fixture) |
|
New Tasks
General Notes