2022-05-10 Mechanical Meeting Minutes

2022-05-10 Mechanical Meeting Minutes

Meeting Participants

Meeting Participants

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


General Announcements

  • If you are going into the bay, please sign the sign in sheet!!

  • Time for a BAY CLEANUP


Drivetrain - Updates

Drivetrain Integration

Champions

  • @Emily Adam (Deactivated)

Updates

  • Tires may still need to go on

  • aiming to get first draft of testing plan done by sunday

  • drivetrain summary page around then as well

Blockers

  •  

Weekly Retrospect

Finish WHOLE drivetrain assembly! Apr 3, 2022

Weekly Targets

Finish WHOLE drivetrain assembly! Apr 10, 2022

 

Wheel Connection

Champions

  • @Asha Mills Emmett (Deactivated)

Updates

  • Got all of A0030 assemblies onto the rover

Blockers

  •  

Weekly Retrospect

Print new test encoder housing @Emily Adam (Deactivated)Apr 1, 2022
Assemble remaining encoders to motors @Emily Adam (Deactivated)Apr 1, 2022
Finish assembly!! Apr 3, 2022
Army print remaining wheel hubs in PETG @Asha Mills Emmett (Deactivated)Apr 3, 2022
Replace fasteners mounting gearboxes to P0106 with flathead screws @Emily Adam (Deactivated)Apr 1, 2022
Cut wheel hub keys to length @Chanpakorn ChaiklahanApr 3, 2022

Weekly Targets

Assemble new encoder mounts on to rover @Emily Adam (Deactivated)Apr 8, 2022
Assemble tires onto rover @Emily Adam (Deactivated)Apr 10, 2022

Chassis

Champions

  • @Andrew Tersigni (Deactivated) @Chanpakorn Chaiklahan

Updates

  •  

Blockers

  • N/A

Weekly Retrospect

(link previous weeks updates here)

Cut comms stand plate with Olabisi’s battery mount plate @Emily Adam (Deactivated)

Weekly Targets

Differential Bar

Champions

  • @Emily Adam (Deactivated)

Updates

  • Added jam nuts on one side!

  • Destroyed the bolt on the other side

Blockers

  •  

Weekly Retrospect

Add jam nuts on either side of the turnbuckles @Emily Adam (Deactivated)Apr 1, 2022

Weekly Targets

Reprint spacers and metal sleeve in PLA @Emily Adam (Deactivated)Apr 10, 2022
Add jam nuts on either side of the turnbuckles @Emily Adam (Deactivated)Apr 10, 2022

Suspension

Champions

  • @Max Apitz-Grossman (Deactivated)

Updates

  • Added missing fasteners to secure the plates

Blockers

  •  

Weekly Retrospect

Create tracking page for build notes/observations (investigate why one side is more rigid than the other) Mar 12, 2022@Max Apitz-Grossman (Deactivated)
Add missing fasteners onto plates @Emily Adam (Deactivated)Apr 1, 2022

Weekly Targets

Drivetrain - High Level Goals

Active Goals

Assemble full drivetrain
Finish printing all wheel connection parts
Finish machining all chassis parts
Finish machining all differential parts
Finish qty 6 wheel connection assy.
Finish differential bar assembly
Finish chassis assembly
Finish suspension assembly

Drivetrain - Known Issues


Arm - Updates

Arm Integration

Champions

  • @Austin Tailon Huang (Deactivated)

Updates

  • Sorted out some updates with Axis owners

  • Strain wave gearbox in process of assembly

  • Tracking master page: https://uwaterloo.atlassian.net/l/c/bvgM5cHA

  • Fit class on crossed roller bearings was improperly spec’d for A1, A3, A4

    • Slight interference was included in upper lower bounds - (potential interference of 9μm)

Blockers

  • Waiting on joints to finish assembly before full arm integration

Weekly Retrospect

Get status update from Axis owners @Austin Tailon Huang (Deactivated)Mar 24, 2022
Create tracking pages on confluence to store build notes, progress pics, photos and observations @Austin Tailon Huang (Deactivated)Mar 24, 2022
Develop joint level testing plans @Austin Tailon Huang (Deactivated)Mar 28, 2022

Weekly Targets

Get status update from Axis owners @Austin Tailon Huang (Deactivated)Mar 31, 2022
Document fit class mis-spec in 2022 Arm - Build Notes@Austin Tailon Huang (Deactivated)Mar 31, 2022
Develop joint level testing plans @Austin Tailon Huang (Deactivated)Apr 4, 2022

Axis 1

Champions

  • @Ryan Mark

Updates

  • Machined shaft

  • Gear arrived!

Blockers

  • Some confusion

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

Epoxy again

Axis 2

Champions

  • @Ryan Chan

Updates

  • Need a little more direction

  • Bracket almost machined

  • Going to need someone to take over for this term

Blockers

  •  

Weekly Retrospect

Weekly Targets

Allocate machining tasks @Ryan Chan
Sync-up on part tracker to create full list of outstanding tasks and parts @Ryan Chan
Host short meeting to touch base on assembly and next steps @Ryan Chan
Machine waterjet parts, large L bracket, find all OTS items

Axis 3

Champions

  • @Kenneth Francis

  • @Conall Kingshott

Updates

  • Touch base with Austin/Max on A3 progress

Blockers

  •  

Weekly Retrospect

Weekly Targets

Locate all A3 parts
Figure out the next steps on assembly

 

Axis 4

Champions

  • @Gavin Mesz @Arlo Symons

Updates

  • Arlo cant get into the bay, can still communicate with Gavin

Blockers

  • Finding fasteners for assembly

Weekly Retrospect

Weekly Targets

Finish assembly 12 and start assembly 48 (48 is top of below and 12 is bottom) Apr 8, 2022
Hoping to get into the bay sometime right after Calc exam on Apr 8, 2022 with Arlo and get a bunch done

Axis 5/6

Champions

  • @Medina Colabrese (Deactivated) @Charmaine Chun (Deactivated) @Olivia Zheng

Updates

  • Assembly done! (minus encoders)

Blockers

  • Where are the broadcom encoders?

Weekly Retrospect

Weekly Targets

O-Drive Enclosures

Champions

  • @Thomas Valer (Deactivated)

Updates

  •  

Blockers

  •  

Weekly Retrospect

Weekly Targets

Integrate feedback from design review @Thomas Valer (Deactivated)Mar 11, 2022
Final review once changes are made

Arm Control Fixture

Champions

  • @Abdul Haseeb (Deactivated)

Updates

  •  

Blockers

  •  

Weekly Retrospect

Weekly Targets

Arm - High Level Goals

Active Goals

Assemble full arm
Finish fabricating all parts for Axis 1
Finish fabricating all parts for Axis 2
Finish fabricating all parts for Axis 3
Finish fabricating all parts for Axis 4
Finish fabricating all parts for Axis 5/6
Assemble Axis 1
Assemble Axis 2
Assemble Axis 3
Assemble Axis 4
Assemble Axis 5/6
Finish O-Drive enclosure design
Fabricate O-Drive enclosures
  • Move completed goals here

Arm Known Issues


Science Updates

Science Integration

Champions

  • @Max Apitz-Grossman (Deactivated)

Updates

  •  

Blockers

  • Some subsystems need to change hands/get more help

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

Drill Bit Module

Champions

  • Zia Formuly

Updates

Done

Blockers

  •  

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

Create assembly drawings @Zia Formuly (Deactivated)
Find all parts and make sure they have been machined @Zia Formuly (Deactivated)
Assemble drill bit module @Zia Formuly (Deactivated)

Dirt Read Head Module

Champions

  • Ronald

Updates

  •  

Blockers

  •  

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

Insert progression target for the week, with owner.

Elevator Modules

Champions

  • @Chanpakorn Chaiklahan

Updates

  •  

Blockers

  • A0034 does not sit well on the frame

  • Sleeves and shafts for A0034 are nowhere to be found

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

Make changes in the assembly drawings for A0034 and A0035
Complete the assembly

Test Tube Module

Champions

  • Ryan Mark

Updates

  • First part of assembly complete (test tube rack)

  • Other part (science lift thing) in the works (some of it done)

Blockers

  • Finding screws and 18-8 McMaster steel threaded rod

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

Find remainder of parts
Finish 2nd part and join with elevator subassembly

Base Frame

Champions

  • Taim

Updates

  • Need to kickstart this assembly again

  •  

Blockers

  •  

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

Create drawings for all t-slot extrusion sub-assemblies

Science - High Level Goals

Active Goals

Assemble full science mechanism
Finish fabricating all parts for drill bit module
Finish fabricating all parts for dirt read head module
Finish fabricating all parts for elevator modules
Finish fabricating all parts for test tube module
Finish fabricating all parts for base frame
Assemble drill bit module
Assemble dirt read head module
Assemble elevator modules
Assemble test tube module
Assemble base frame
  • Move completed goals here

Science - Known Issues


Electrical Box - Updates

Champions

  • @Thomas Valer (Deactivated)

Updates

  •  

Blockers

  •  

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

Meet to do final review of ebox mounting @Emily Adam (Deactivated)@Thomas Valer (Deactivated)@Austin Tailon Huang (Deactivated)Mar 2, 2022

Electrical Box - High Level Goals

Active Goals

Assemble electrical box on new chassis
Determine level of rework for electrical box
Verify fully enclosed mass
  • Move completed goals here


End Effector - Updates

Champions

  • @zia formuly

Updates

  •  

Blockers