2023-03-21 Mechanical Meeting Minutes
Attendance (11)
Thomas
Josh
David
Chan
Iram
Patric
Shabd
Martin
Yuming
General Updates
Goals for the remainder of the term
Unassigned Task
Science (Chan and David)
Geneva mechanism and depositing dirt into test tubes (Chan and David)
Elevator system (Chan and David)
claw/drill (Chan and David)
Sensor head (Chan and David)
Look into how many test tubes are needed (Ask Clare during leads meeting)
Drivetrain (Josh and Thomas)
[1] Chan has created a jig to machine the current joints to add a dowel pin, someone needs to take it appart, machine it and implement new parts X6
[2] Use CAD to get Weight of Drivetrain
[3] Look into issues with current encoders, why are they making contact, how can they be fixed
[4] Working with electrical team to find a wire management solution for the drivetrain, this can be looked at in CAD first (look at current wiring on rover)
[5] Look into how the wheels are mounted and how it can be improved. Ideally something more durable than 3D print, but still taking weight into account. Also how the wheel can be inflated so we can adjust pressure. A lower priority is to look into adding additional traction.
[6] Weight Reduction Mfg Efforts
Chan and David have looked into weight reduction for the Drivetrain. These need to be machined: https://docs.google.com/presentation/d/1wstY4dRb815OmPSuzb7UD2b258Mu2mQKGnyBB1zf3rU/edit?usp=sharing
Weldment?
[7] Work with electrical to finalize parts list and design Ebox
[8] Update CAD to see how high the gimbal can be, then manufacture and assemble it with the updated pieces
Talk to Nico about requirements for autonomy → he mentioned we may want gimbal to be fixed. If so, what height should it be to ensure proper fov?
Arm (tbd)
Use Cad to get weight estimate of the arm
Secondary
Plates on bottom of arm need to be removed, someone can look into updating the drawings
Weekly Updates
Member | Project(s) | Updates | Action Items | Blockers |
---|---|---|---|---|
@Austin Tailon Huang |
|
|
|
|
@Chanpakorn Chaiklahan | Science |
|
|
|
David Choi | Science |
|
|
|
Gavin |
|
|
|
|
Iram | Science |
|
|
|
@Joshua Harper | 7 |
|
|
|
Martin | 3, 5 |
|
|
|
Patrick | 3, 5 |
|
|
|
Shabd | 1 |
|
|
|
@Thomas Valer |
|
|
| |
Yuming | 1, 7 |
|
|
|
Ryan Scomazzon | 8 |
|
|
|
Notes:
Grabcad plans?
talk to austin/teerstra
potential for drivetrain fix for next URC
adding rotating wheels for better on the spot turning
carbon fiber and weight reduction
potential for welding where applicable
making drivetrain an enclosure instead of a platform
CRC
focus on getting current rover ready with current design
fix current issues
Drivetrain is main focus
science
next meeting find out who is on COOP and in waterloo
Active Projects
Arm
ID | Description | Assigned to | Deadline | Comments | Priority |
---|---|---|---|---|---|
ARM1 | Vet/validate full mechanical build |
|
| I | |
ARM2 | Select wrist cam; design mount | Yuming |
|
| II |
ARM4 | Complete joint level load testing |
|
|
| III |
ARM7 | Design + manufacture allen key tool | Shabd |
|
| IV |
ARM8 | Differential wrist assembly fixture |
|
|
|
|
Drivetrain
ID | Description | Assigned to | Deadline | Comments | Priority |
---|---|---|---|---|---|
DT5 | Design, mfg, & assembly of comms stand | Gavin |
|
| I |
DT6 | Design, mfg, & assembly of battery mount | @Thomas Valer |
|
| II |
Science
ID | Description | Assigned to | Deadline | Comments | Priority |
---|---|---|---|---|---|
SCI1 | Complete full mechanical assembly | @Chanpakorn Chaiklahan |
|
| I |
| Test Tube Rack | Yuming |
|
| I |
SCI3 | Create low level arduino scripts to power every actuator, and read from every sensor on science |
|
|
| II |
SCI4 | Process a full sample |
|
|
| III |