| | |
|---|
@Ali Kasim Budhwani (Unlicensed) | | |
@Former user (Deleted) | | |
@Ethan Cronier (Deactivated) | End effector design done design review?
| Steven gong sort out confluence Look for Dino science camera fix science timeline fix gripper backlash figure out the issue with baclash guage the pins - Steven mass budget excel sensor list for science figure out weight of drivetrain
|
@Mathieu Harter (Deactivated) | Selected some motor options for A3, meeting with Austin tonight to finalize the selection Concept sketch for arm done
|
L2 milled with ribs? welded plate?
|
@Austin Tailon Huang (Deactivated) | selected some options for A2 actuator and designed a rough strainwave gearbox for A2 work on design for A1 spoke with SKF, turntable bearings are not viable. will need to purchase cheaper/lighter options
| update training (thanks steven ) create parasolid and key operational notes for strainwave if permissible, and send to Cory get more money for A2 lol order stuff from electromate when gleeson replies (will be looking out for this asap) finalize and potentially move forward with ordering A2 components FIX TOOLBOX NOBODY USE RN, 2022 CHANGED SETTINGS need to pour through A3 data, forgot to do this bully Haseeb for encoders
|
@Jasmine Milan (Deactivated) | Document current comms hardware on this confluence page Removed communication components from the rover Begun assembly on portable comms system
|
|
@Olabisi Sanusi | |
|
@Thomas Valer (Deactivated) | | |
@Steven |
| leave this for next week |