2020-07-28 Meeting Minutes - General

2020-07-28 Meeting Minutes - General

Update & Action Items

Member

Update

Action Items

Member

Update

Action Items

Andrew T.

  • Working on ->

  • New arm pcb integration design

    • Hand off to Emily for layout when done

  • Connector hub for TQ motor configuration

Andrew Z.

  • Started on very simplified version of current CAD model

  • Finished simple version of drivetrain subassembly that’s attached to the wheels (not sure if there’s a name for it)

  • Work on frame

  • Work on arm

Alaina

  • Hub attachment 

  • Science camera mount

  • 4-Wheel CAD

  • Welding document 

Asha

  • Drivetrain falling math

  • Beam bending reading

  • Science CAD fixes (elevator height etc)

  • Drivetrain material properties etc

Caleb

  • Gimbal - added metal bearings (made hole bigger & stuck needle bearings instead of printed ones)

  • Gimbal - shortened it (more compact roll/pitch)

  • Gimbal - Epoxy calcs (epoxy works)

  • Science motors - confirmed eligible motors 

  • Briefed on claw ideas for hex key 

  • Met with Tony for ANSYS

  • Possible designs / ideas for claw hex key

  • Haven’t verified ansys license yet

    • Figure out after meeting

Tony

  • Motor test bench design finished

  • Firmware flashed

Drivetrain work

  • Define drivetrain constraints and requirements in system doc

  • Finish reading unidirectional composite material properties, estimate structural member sizes

  • Design a 3-D printed motor housing

  • Finish alternate design using ILM 115X25

  • Source and purchase appropriate power resistor for Odrive

  • Flash Odrive firmware st-link on disco board; also probably need to configure based on the encoder being used

  • Tire energy methods FBD

 

Claw re-work

  • Allen key attachment friction-torque calculation

  • Finish flexure design

 

Documentation / Support work

  • Editing TQ meeting document so it’s readable for everyone

  • Start new ordering sheet; add good slip-ring to ordering sheet

 

Misc work

  • Set-up Solidworks PDM / SQL 2014

  • Make a typical manufacturing tolerances table

Cole

  • E-box connector panel

  • 3D-Printing research

  • Figuring out topology optimization “smart infill”

  • Finalize e-box connector panel  

    • Meet w/ david → Waiting on kyle from electrical? 

  • 3D-Printing

    • Print & test some parts

Emily

  • Laid out groundwork for stress/strain analysis for CF members

  • Finalize science PCB plan & put into CAD

  • Finalize stress/strain research once I receive values from Asha

David 

  • Redesigned bottom plate for science to have mount for PiCam

  • Experimented with topological optimization and generative design for PiCam bracket mount

  • Researched alternative materials for e-box

  • Have meeting with Cole about e-box connectors

  • Finalize layout for e-box components

  • Re-design bottom plate for science to have mount for science

  • Looking for more work (drivetrain/looking for something more technical) - hopefully something I can finish by September