2020-09-22 Meeting Minutes - General

Update & Action Items

MemberUpdateAction Items

Andrew T.

  • Worked on ->
  • Odrive pcb enclosure
    • Draw a picture of wire IO
  • Arm board
  • Finalizing Arm Motor Controller connecter layout and mounting 

Andrew Z.


  • Simplified version of arm
    • Pending Re-assignment
  • Meeting about E-box
    • Tony sent an email invite for E-box trello

Alaina

  • Working on: Hub attachment, business and putting out fires

Asha

  • Science CAD motor updates
    • Pending Design Review
  • Timeline plans
  • Science prototyping
  • Orders
  • Task delegation (coordination with Tony)
  • Science camera mount

Caleb

  • Motors
  • DXF’s sent out to aidan
  • Linear actuator verification (new one is 1” longer)
  • Hex 
    • spaenaur springs
    • 3d print springs cause we can’t get them to me
    • design review sometime (will look into 3d printed springs first tho)
  • Print Gimbal (Ordered some pla on sale, maybe I’ll use this)
    • figure out reimbursement thing
    • (print using my own PLA for now)

Tony

  • Confirmed final components going into E-box w/ Adrianna
  • Reworked E-box mechanical (hinge, lock, paneling assembly)
  • Went over 24V Motor ordering, carts made*
  • Drivetrain Tire DAQ complete, analyzing at this point

Arm

  • Determine if Linear Actuator selected is acceptable

Drivetrain work

  • Strain Energy Analysis of Wheel Assembly MOD-1

Documentation / Support work

  • Start new ordering sheet; add good slip-ring to ordering sheet

Misc work

  • Set-up Solidworks PDM / SQL 2014
  • Hamachi alternative or increase size

Emily

  • Finished PCB integration
  • E-bos design! check trello
  • Help Asha move stuff from the bay & update science with new parts

Mathieu


  • O-drive enclosure locking design

Anas


  • Stress analysis on the drive system.  

Daniel


  • Finish Training