Andrew T. | | |
Andrew Z. | | |
Alaina Hansen | | |
Asha Mills Emmett | | |
Caleb | | Arm revision Claw gripper redesign
|
Tony Liu | Sent Spaenaur list of fasteners we needed (base station, gimbal, arm revision, science) (s/o to Asha) Sent drawing of arm hub block Got some parts of the arm revision printed (s/o to Ari)
| Arm Export manufacturing files for arm parts needing laser cutting (dxfs), figure out who will make them. Order off of McMaster-carr based on BOM Order 24V Elbow motor 1 (Tony needs to review costs) Order lazy susan
Main Assembly Sponsor Logos Drivetrain work (On Hold) REIMBURSE ETHAN |
Daniel | | |
Austin Huang | | Get feedback on first design iteration for claw Go through measurement data to ensure printed base plates are within spec Fit test base plates with screws
|
Jasmine Milan | | Import PDB rev 2 and CAN breakout board rev2 into assy Strain Relief for antenna cords Add fasteners (change holes to accommodate) Add hole on rear panel for battery connector - double check PDB alignment so that PDB-battery connector is oriented to be close to rear panel battery hole. Create performance configuration of E-box PCBs
|
Ethan | | Final assembly when fasteners come in (base station) Resketch antenna connections (draw.io) Sketch custom standoffs (maybe)
|
Rehnuma | | |
Max | | |
Medina | | Update assembly with sponsor panel Need sponsor logos Figure out a way to attach sponsor logos to panels Figure out wire routing - arm
|
Mathieu | | Change fasteners to Spaenaur Get it made (work Andrew / Tony) Take out wrist shaft from robot arm Open all packages addressed to Tony (Shu Yan) Liu
|