/
2019 ~ 2021 Build
2019 ~ 2021 Build
Budget (2020-2021)
Arm (2020-2021)
Base Station (2020-2021)
Drivetrain (2020-2021)
Electrical Box (2020-2021)
- E-Box Progress Tracker (2020-2021)
- E-Box Order History (2020-2021) (ORDER COMPLETED)
- Electrical Box Design Overview (2020-2021)
- E-Box 2020-2021 BOM
Gimbal (2020-2021)
Science (2020-2021)
2021 SAR Build Master Actuator/Encoder Spreadsheet
2020 Master Actuator Spreadsheet
Folder Structure 2020
2021 SAR Video Planning
Mech Meeting Minutes (2019 ~ 2021)
, multiple selections available,