2020-06-09 Meeting Minutes - General

2020-06-09 Meeting Minutes - General

Update & Action Items

Member

Update

Action Items

Member

Update

Action Items

Andrew

  • Working on -->

  • Brainstorm/sketch hub motor attachment

  • Finish arm & motor controller pcb integration onto arm

Alaina

  • Working on 1 & 2

  • Weight of joints for 6-wheel design 

  • CAD based on Tony’s FBD 

  • Figure out how to attach hub motor  

  • Treads?

  • Chain on science (postponed)  

Asha

  • Updated science flap

  • Member training plan

  • Drivetrain - wheel deformation modeling

  • Minor updates to science CAD

  • Motor calculations

Caleb

  • Gimbal Design Review

  • Battery box (research into how other people make them)

  • Rover main drive torque calc (confirming)

  • Gimbal redesign - Use 9g servo. 

  • Gimbal redesign - Align camera axis

  • Gimbal redesign - find replacement (lower amps for current HiTech servos)

Cindy

  • IMU mounting considerations

  • IMU mounting considerations

Tony

  • Selected 1 hub motor for testing, unknown if torque requirement matches

  • Approx.ed beach wheel measurements, prelim CAD for wheel hubs underway

  • Read 15/70 pages of composite book chapter

  • Drive train project support / management

  • Mech design review

  • Sketch and CAD preliminary design for wheel hubs

  • Finish reading unidirectional composite material properties, estimate structural member sizes

  • Get hub motor ordered

  • Define drivetrain constraints and requirements in system doc

David

  • Trying not to be depressed about army

  • Finished shovel re-design

  • Started e-box CAD

  • Finalize e-box layout

  • Design testing frame/procedure for shovel re-design

Cole

  • Source & CAD new wrist slip ring

  • Design e-box connector panel

  • E-box lid design

Emily

  • Uncovered hub motor specs

  • Refined ideas for the science mechanism’s seal

  • Attaching drivetrain to 2020 chassis

General Notes

  • Lightning talk -