Andrew Tersigni | | |
Alaina Hansen | PDR! Update on wheel hub?
| |
Asha Mills Emmett | No assun gearboxes :( McMaster order
| |
Caleb Tseng-Tham | | |
Tony Liu | | Finish machining package for Demtool Source new slip ring for arm Call Martin Pepin Wednesday/Thursday (Spaenaur Contact)
Get reimbursed (24V motors, replacement components, stock orders, McMaster-carr order) Order from McMaster-carr based on BOM (Finish Cart and double check) Order 24V Elbow motor 1 (Just order from ASSUN, send an email reply)
Main Assembly |
Austin Huang | Finished first revision for netzer encoder mounts on wrist Cleaned up CAD for assemblies using netzer encoder models Put parts on McMaster list for Netzer encoder mounts
| |
Jasmine Milan | Imported CAN breakout board REV2 into assy (Issues with PDB persist) Picked cord grips for ethernet cords (needs approval) Added hole on rear of panel for battery + estop connection (*need to add strain relief / specific sizing)
| Touch base with electrical team on size of cords going through battery/estop connector hole to develop strain relief solutions Mcmaster order for new components inside E-box Once strain relief approved, update CAD Talk to Ethan about location of batter/estop connector hole Create performance configuration of E-box PCBs
|
Ethan Cronier | |
Assembly stuff - held up |
Rehnuma Tasneem | | |
Max Apitz-Grossman | | |
Medina Colabrese | | Find sponsor logos with Lance Figure out a way to attach sponsor logos to panels Keep planning wire routing for the arm Talk to Ari about wire harnessing
|
Abdul Haseeb | Fixed the gimbal mate and removed a repetition that appeared in the other main assembly Removed the 2021 design for the drive train as its no longer being used Small electrical component in gimbo is not able to be deleted for some reason
| |
Mathieu Harter | | Change fasteners to Spaenaur Motor mount bracket analysis Open for more tasks after exams
|