2020-11-02 Meeting Minutes - General

Goals


Update & Action Items

MemberUpdateAction Items

Andrew T.

  • Added 3d printed plugs to odrive box
  • Odrive box design review meeting?

Andrew Z.

  • Finished some parts for arm model
  • Continue work on arm model
  • Rotational inertia data

Alaina

  • Finished hell week, into another version of hell week 
  • Hub, PDR, Business

Asha

  • Finished drawings and STEPs for sponsors
  • Motors arrived :o
  • Assembly
  • Project management for battery cage re-design

Caleb

  • Motor calcs (redid turntable calc, checked shoulder with asha)
  • Fasteners for mech ordering 
  • Bearings added to order
  • gimbal 
    • Spaenaur orders (fasteners) (add ultrasonic inserts)
    • Update Gimbal model with Spaenaur Ultrasonic Inserts

  • Arm revision w/ Tony

Tony

  • Emailed ASSUN for in-kind motor sponsorship
  • Finished arm - wrist revision analysis
  • Finished arm revision CAD
  • Printed drivetrain hub motor MOD-1

Arm

  • Finish drafts of machined arm revision components
  • Export manufacturing files for arm revision components (dxfs, stls)
  • Make a BOM
  • Send Spaenuar fastener fastener list on Friday

Drivetrain work

  • Strain Energy Analysis of Wheel Assembly MOD-1
  • Assemble MOD-1 hub motor and test

Sourcing

  • Send out Spaenaur order (need to come up with list of stock fasteners first) 

Base station

  • Come up with system diagram

Mathieu


  • Upload O-drive box files

Daniel

  • Added metric fasteners to the common components library

Austin

  • Updated bicep with netzer encoder mount
  • Figure out what’s going on with turntable shaft 
  • Design encoder mount for shafts on claw

Jasmine

  • E box connector Edits
  • Strain Relief for antenna cords

Ethan

  • Bom finished (for rev1)
  • All Orders placed
  • Dxfs created
  • Sketch antenna connections required
  • Determine where switch will go and if strain relief is required
  • Possible base plate redesign
  • Order base plate from E-3 Machine-shop 

Rehnuma

  • Sketch for camera placement
  • CAD for science camera mount design
  • Machine wrist shaft


New Tasks

Task

Assigned to

Gimbal assembly - in person


Base station Design

Ethan C.

Science machining/assembly - in person


E-box connector panel

Jasmine 

Arm encoder mount design

Austin

Science camera mount design

Rehnuma

Re-machining wrist shaft - in person

Rehnuma

Arm camera mount design

Max 

E-box component layout and wire management

Jasmine

Battery cage redesign

Daniel 

E-box project management 

Jasmine

General Notes