Update & Action Items

Member

Update

Action Items

Member

Update

Action Items

Andrew T.

  • Worked on CAD for ->

  • Connector hub for TQ motor configuration

  • Finalize PCB shapes w/ Tony (Finish by Friday)

    • Update: not done

Andrew Z.

  • Finished up frame

  • Created assembly (along with STL file)

  • Start arm 2D sketch

Alaina

  • Working on: Hub attachment 

    • May be redundant, see 8/18

  • Welding document 

  • Science camera mount

Asha

  • Drivetrain calculations excel sheet

  • Science CAD fixes (elevator height etc)

  • Drivetrain material properties etc

  • Machining thread on a lathe

Caleb

  • Cleaned up Arm CAD 

  • Claw hex key

    • figuring out how to do it still

    • most commercial applications are probably too big, are connection severing, or too expensive ($200+)

    • look into a ratcheting mechanism

  • Still some issues with arm CAD

    • Not sure who did which parts of the arm, some holes already had missing fasteners

    • Final gimbal review (elephant foot)

Tony

  • Set-up motor testing w/ firmware

  • Tube connector design

Drivetrain work

  • Define drivetrain constraints and requirements in system doc

  • Finish reading unidirectional composite material properties, estimate structural member sizes

  • Design a 3-D printed motor housing

  • Finish alternate design using ILM 115X25

  • Source and purchase appropriate power resistor for Odrive

  • Flash Odrive firmware st-link on disco board; also probably need to configure based on the encoder being used

  • Tire energy methods FBD

  • Fix CAD configuration with the mock-up hub

 

Claw re-work

  • Allen key attachment friction-torque calculation

  • Finish flexure design

 

Documentation / Support work

  • Editing TQ meeting document so it’s readable for everyone

  • Start new ordering sheet; add good slip-ring to ordering sheet

 

Misc work

  • Set-up Solidworks PDM / SQL 2014

  • Make a typical manufacturing tolerances table

Cole

  • Figured out smart infill 

  • Finalize e-box connector panel  

    • Meet w/ david → ??? → haven’t heard from him in a while

  • Research what’s needed to use PC filaments with PRUSA I3

    • Figure where to order the I3 MK3 from, and source materials for heated enclosure

Emily

  • Calculated necessary weld throat size for shear stress on the drivetrain

  • Review calculations, calculate torsional and bending? (help)

David 

  • Redesigned bottom plate for science to have mount for PiCam

  • Experimented with topological optimization and generative design for PiCam bracket mount

  • Researched alternative materials for e-box

  • Have meeting with Cole about e-box connectors

  • Finalize layout for e-box components

  • Re-design bottom plate for science to have mount for science

  • Looking for more work (drivetrain/looking for something more technical) - hopefully something I can finish by September