Andrew | | |
Alaina | | |
Asha | | |
Caleb | Spot welding : stronger connection, more surface area, hotter, could damage battery Wire bonding : more resistance, wire acts as fuse, less damage to battery during assembly Thermal management system? Wavy pipes? (patent20110212356) Simply buy a bunch of single cells. Add them up in series till we get our desired voltage. Then stack them in parallel. | Gimbal review tonight Clean up motor sheets. Do some calculations on the motors to confirm loads Work with electrical to see PCB final size. Right now 2”x2” square If we’re continuing with a custom battery, will need to know max dimensions.
|
Tony | | Define drivetrain constraints and requirements in system doc Review prelim drive train wheel with Nathan M (everyone welcome) (may not happen for a while) Sort out E-box wiring, use info to order connectors Finish reading unidirectional composite material properties, estimate structural member sizes Need to re-upload solver installation packages to MEGA drive
|
Cole | | |
Emily | | |
David | Finished adding shovel to science assembly Did shovel torque calculations Talked to electrical about connectors and wiring for e-box
| Have meeting with Cole about e-box connectors Finalize layout for e-box components Re-design bottom plate for science to have mount for science Looking for more work (drivetrain/looking for something more technical) - hopefully something I can finish by September
|