2021-09-09 Meeting Minutes - Drivetrain

2021-09-09 Meeting Minutes - Drivetrain

17 Days until Prototyping Conclusion!

Goals

Current State of Progress & Action Items

Prototype

  • Mechanical assembly

    • It's actually.....working?? (for the most part)

    • Mechanical assembly needs to be made more robust

    • Prepare for testing

    • To do still:

  • Controls

    • Wireless communication and basic movement are done!

    • To do (@Former user (Deleted)):

Update & Action Items

Member

Update

Action Items

Member

Update

Action Items

@Emily Adam (Deactivated) (Differential bar)

 

  • Work on mechanical fixes to prototype, this Saturday and Sunday

  • Redesign → order and drop off plates for machining

  • Locate weights

  • Pick out motors (during the week), follow-up with Austin

  • Reach out to Fraser and Nathan about current chassis design

@Former user (Deleted) (Wheel connections)

 

  • Set up ANSYS for Karan

  • Do some connection research, early CAD

  • Confirm motors, figure out motor integration

@Former user (Deleted) (Chassis)

 

  •  Produce chassis mounting dimensions and (rough) layout drawings → by end of the Sept 19th

  • Confirm with Farris about antenna plan 

@Former user (Deleted) (Stress calculations)

  •  First look at FEA

  • TBD about commitment...by next week?

  • Download ANSYS

  • Dive deeper into FEA

@Former user (Deleted) (Frame/structure)

  • Spent a lot of time in the machine shop for arm team

  • cad for frame & joints

  • fix + print mounting for battery and weights

 

General Notes 

  • Add cross members/stiffening in chassis

  • Get feedback from past drivetrain members? 

  • Want to test carbon fibre → mounting piece bonding (TBD)