Update & Action Items
Member | Update | Action Items |
---|
Andrew T. | | - Odrive pcb enclosure
- Tony needs to actually send the wire out this time
- Arm board
- Figure out with Lance and Kyle
|
Andrew Z. |
| - Simplified version of arm
- Send STL files to Azum N via slack.
- Meeting about E-box
|
Alaina | - Working on: Hub attachment
| |
Asha | | - Science prototyping
- Machining thread on a lathe
- Figure out laser cutting stuff with Tony
|
Caleb | - Hex prototypes/some calcs finished
- layers adding unwanted friction >:(
- Friction clutch not feasible (plastic creep/heat deformation & not enough surface area)
- Gimbal PCB connector placement (except power)
- Slight changes to gimbal PCB (added standoffs)
- Confirmed Assun motors AM-CL3570GA/B series still exists (torque-current curves added to documentation)
| - Hex key - print prototypes
- finish calculations (verify FBD)
- Figure out spring
- Motors
- Verify science motors with Asha/Lance
- Finalize Linear actuator
- Gimbal PCB connector placement (need power from EE and will create the DXF files for Aidan once I get that)
- (Lance currently in process of getting that)
- Clean up motor datasheet (some unneeded motor data and need to find stall current for some)
|
Tony |
- Drivetrain tire arrived, measure dimensions and weighed
| Drivetrain work - Design Analysis of Wheel Assembly MOD-1
- Define manufacturing workflow for drivetrain
- Create a BOM for wheel assembly for cost analysis
- Define drivetrain constraints and requirements in system doc
- Finish reading unidirectional composite material properties, estimate structural member sizes
- Tire energy methods FBD
- Wheel force jig
Gimbal
Odrive
Documentation / Support work - Editing TQ meeting document so it’s readable for everyone
- Start new ordering sheet; add good slip-ring to ordering sheet
Misc work - Set-up Solidworks PDM / SQL 2014
- Make a typical manufacturing tolerances table
- Arrange time for E-box meeting
|
Cole | | - Finalize e-box connector panel
- Meet w/ david → ??? → haven’t heard from him in a while
- Research what’s needed to use PC filaments with PRUSA I3
|
Emily | - Finished rocker hub design with variable angles
|
|
David | - Redesigned bottom plate for science to have mount for PiCam
- Experimented with topological optimization and generative design for PiCam bracket mount
- Researched alternative materials for e-box
| - Have meeting with Cole about e-box connectors
- Finalize layout for e-box components
- Re-design bottom plate for science to have mount for science
- Looking for more work (drivetrain/looking for something more technical) - hopefully something I can finish by September
|
General Notes
CAD Mouse Allocation:
Members confirmed getting a mouse:
Asha, Alaina, Caleb and Emily
- Next person who does go and get their mouse, please put masking tape label with name over mouse boxes so people can pick up their box
3 left, only 2 more are available for Mech members.
If you need a mouse, let Tony know, we will discuss