2020-09-08 Meeting Minutes - General

Update & Action Items

MemberUpdateAction Items

Andrew T.

  • Worked on ->
  • Odrive pcb enclosure
    • Tony needs to actually send the wire out this time
  • Arm board
    • Figure out with Lance and Kyle

Andrew Z.


  • Simplified version of arm
  • Send STL files to Azum N via slack.
  • Meeting about E-box

Alaina

  • Working on: Hub attachment
  • Science camera mount

Asha

  • Science CAD
  • Science prototyping
  • Machining thread on a lathe
  • Figure out laser cutting stuff with Tony

Caleb

  • Hex prototypes/some calcs finished
    • layers adding unwanted friction >:(
    • Friction clutch not feasible (plastic creep/heat deformation & not enough surface area)
  • Gimbal PCB connector placement (except power)
  • Slight changes to gimbal PCB (added standoffs)
  • Confirmed Assun motors AM-CL3570GA/B series still exists (torque-current curves added to documentation)
  • Hex key - print prototypes
    • finish calculations (verify FBD)
    • Figure out spring
  • Motors
    • Verify science motors with Asha/Lance
    • Finalize Linear actuator
  • Gimbal PCB connector placement (need power from EE and will create the DXF files for Aidan once I get that)
    • (Lance currently in process of getting that)
  • Clean up motor datasheet (some unneeded motor data and need to find stall current for some)

Tony


  • Drivetrain tire arrived, measure dimensions and weighed 

Drivetrain work

  • Design Analysis of Wheel Assembly MOD-1
  • Define manufacturing workflow for drivetrain
  • Create a BOM for wheel assembly for cost analysis
  • Define drivetrain constraints and requirements in system doc
  • Finish reading unidirectional composite material properties, estimate structural member sizes
  • Tire energy methods FBD
  • Wheel force jig

Gimbal

  • Print Gimbal parts

Odrive


Documentation / Support work

  • Editing TQ meeting document so it’s readable for everyone
  • Start new ordering sheet; add good slip-ring to ordering sheet

Misc work

  • Set-up Solidworks PDM / SQL 2014
  • Make a typical manufacturing tolerances table
  • Arrange time for E-box meeting

Cole

  • Figured out smart infill 
  • Finalize e-box connector panel  
    • Meet w/ david → ??? → haven’t heard from him in a while
  • Research what’s needed to use PC filaments with PRUSA I3

Emily

  • Finished rocker hub design with variable angles

David 

  • Redesigned bottom plate for science to have mount for PiCam
  • Experimented with topological optimization and generative design for PiCam bracket mount
  • Researched alternative materials for e-box
  • Have meeting with Cole about e-box connectors
  • Finalize layout for e-box components
  • Re-design bottom plate for science to have mount for science
  • Looking for more work (drivetrain/looking for something more technical) - hopefully something I can finish by September 

General Notes

CAD Mouse Allocation:

Members confirmed getting a mouse:

Asha, Alaina, Caleb and Emily

  • Next person who does go and get their mouse, please put masking tape label with name over mouse boxes so people can pick up their box

3 left, only 2 more are available for Mech members.

If you need a mouse, let Tony know, we will discuss