2020-10-06 Meeting Minutes - General

Update & Action Items

MemberUpdateAction Items

Andrew T.

  • Revised 3d-printed standoff replacements
  • Finished ODrive box (except for brake resistor mounting holes)
  • Waiting on brake resistor cad to update odrive box

Andrew Z.


  • Simplified version of arm
  • Meeting about E-box

Alaina

  • Working on: Hub attachment

Asha

  • Science design review changes
  • Science prototyping
  • Orders
  • Slip-ring replacement machining 
  • Gimbal printing

Caleb

  • 3D printing components via Agile (sending parts to Lance and he handles it)
  • Hex (on hold for now)
    • Finish up equations for determining spring needed
    • Remake design to be completely 3d printable
  • Gimbal Assembly
  • Gimbal - prepare a BOM
    • Spaenaur fasteners 
  • Gimbal top half - redesign

Tony

  • Slip-ring replacement ordered
  • Start new ordering sheet; retroactively added all orders

Arm

  • Finish arm revision and draft machined components
  • Moment of Inertia matricies for each joint for SW
  • Contact ASSUN and ask for sponsorship

Drivetrain work

  • Strain Energy Analysis of Wheel Assembly MOD-1

Emily

  • Got electrical’s preferences for e-box connectors
  • Discussed wire harnessing task with electrical
  • Complete wire harnessing task
  • Research connectors

Mathieu

  • MOD 0 of locking tabs for Odrive box
    • Design review with Andrew and Matthieu at Thursday 8 PM

Daniel

  • Finished Training
  • Added metric fasteners to components library

Austin

  • Finished Training
  • Netzer - Broadcomm compatible encoder mount 
Ethan
  • Base station Design

Jasmine
  • E-box connector panel

Rehnuma
  • Science camera mount design


New Tasks

Task

Assigned to

Gimbal assembly - in person


Base station Design

Ethan C.

Science machining/assembly - in person


E-box connector panel

Jasmin 

Arm encoder mount design

Austin

Science camera mount design

Rehnuma

Fastener library

Daniel Q.

Re-machining wrist shaft