2022-03-22 Mechanical Meeting Minutes
Meeting Participants | ||
---|---|---|
@Max Apitz-Grossman | @Ryan Mark | @Emily Adam |
@Olabisi Sanusi | @Austin Tailon Huang (Deactivated) | @Conall Kingshott |
@Kenneth Francis | @Christopher James Kenneweg (Deactivated) | @Thomas Valer (Deactivated) |
@Jasmine Milan (Deactivated) | @Arlo Symons | @allen |
@Zia Formuly (Deactivated) | @Chanpakorn Chaiklahan |
|
|
|
|
General Announcements
Austin is back from vacation, hello :]
Need to get everyone’s information in the member registry, and you guys need to sign it when you go to the bay next
Add yourselves to the participants list when you can
Build session this Saturday, 1pm?
Drivetrain assembly
Others?
Drivetrain - Updates
Drivetrain Integration
Wheel Connection
Chassis
Differential Bar
Suspension
Drivetrain - High Level Goals
Active Goals
Assemble full drivetrain
Finish printing all wheel connection parts
Finish machining all chassis parts
Finish machining all differential parts
Finish qty 6 wheel connection assy.
Finish differential bar assembly
Drivetrain - Known Issues
Arm - Updates
Arm Integration
Axis 1
Axis 2
Axis 3
Axis 4
Axis 5/6
O-Drive Enclosures
Arm - High Level Goals
Active Goals
Assemble full arm
Finish fabricating all parts for Axis 1
Finish fabricating all parts for Axis 2
Finish fabricating all parts for Axis 3
Finish fabricating all parts for Axis 4
Finish fabricating all parts for Axis 5/6
Assemble Axis 1
Assemble Axis 2
Assemble Axis 3
Assemble Axis 4
Assemble Axis 5/6
Finish O-Drive enclosure design
Fabricate O-Drive enclosures
Arm Known Issues
Science Updates
Science Integration
Drill Bit Module
Dirt Read Head Module
Elevator Modules
Test Tube Module
Base Frame
Science - High Level Goals
Active Goals
Assemble full science mechanism
Finish fabricating all parts for drill bit module
Finish fabricating all parts for dirt read head module
Finish fabricating all parts for elevator modules
Finish fabricating all parts for test tube module
Finish fabricating all parts for base frame
Assemble drill bit module
Assemble dirt read head module
Assemble elevator modules
Assemble test tube module
Assemble base frame
Science - Known Issues
Electrical Box - Updates
Electrical Box - High Level Goals
Active Goals
Assemble electrical box on new chassis
Determine level of rework for electrical box
Verify fully enclosed mass
End Effector - Updates
End Effector - High Level Goals
Active Goals
Assemble end effector
Gimbal/Vision - Updates
Wrist Camera
Gimbal/Vision - High Level Goals
Active Goals
Rework gimbal parts
Assemble reworked gimbal
Finish wrist camera mount design
Fabricate wrist camera
LED Matrix - Updates
LED Matrix - High Level Goals
Active Goals
Rework old LED matrix
Install LED matrix on new rover
Battery Mount - Updates
Battery Mount - High Level Goals
Active Goals
Finalize design of new battery mount
Fabricate battery mount
Install battery mount on new rover
E-Stop - Updates
E-Stop - High Level Goals
Active Goals
Install E-stop on rover Mar 12, 2022
Comms - Updates
Comms - High Level Goals
Active Goals
Verify capabilities of comms station
Determine if antennae position rework is necessary
Other Updates
Bay safety updates? @Allen Loukiantchenko
Gotta message graeme
NEW TASKS:
Roles to be assigned:
Comms. verification + potential rework
, multiple selections available, Use left or right arrow keys to navigate selected items