Goals
- Get orders done for stock and COTS parts
- Continue machining drivetrain + arm
- Get all drawings finished soon
High-Level Overview
General
Assembly Tracker: https://docs.google.com/spreadsheets/d/1x9vvX5iYVu1dqfgCTcVoqFY9kpOc9GH6CGEYmtVIWNw/edit#gid=0
Arm
- All COTS orders funding is arranged, orders will be placed this week
- Machining and drawing production needs to ramp up
Drivetrain
- Ramping up manufacturing, design is finally done
- Want to get remainder of parts made this and next week
- Feb 14 - demtool coming
Update & Action Items
- If you're free to machine, state your availability for this week!
Member | Update | Action Items |
---|
Emily Adam |
| Finalize P0097 to send to Demtool → ASAPRespond to Thomas- Coordinate this week's machining for the drivetrain
- Water jet components, 3D printed parts, CNC'd parts
- Final changes to p0043, update the drawing
- Order remaining arm stock from EMS
- Help with machining
- Also verify location of black flies, look for RLS package
|
Austin Tailon Huang | - grinded out motor test rig
- contacted sponsors and got orders for OTS parts arranged
- camera is located for arm
| - order everything for arm
- continue to support drawing production
- work with Emily and Max to get all stock orders fulfilled
|
Max Apitz-Grossman | - Forgot to look into bay access calendar
| - McMaster arm stock, DFRobot, KHK orders
- Look into bay access calendar
- Science - maybe jasmine
- Clean up suspension BOM (aluminum)
|
Ethan Cronier | - going ham on machining
- lead stuff
| - keep doing what hes doing
- P0260, 0105
|
Andrew Tersigni (Deactivated) | - made changes to front plate
- updated DT cad w/ aluminum chassis
|
|
Asha Mills Emmett | - P0105 updated for aluminum
- Fixed drawings and CAD cleanup
| - Fix OTS parts
- maybe machining
|
Elizabeth Jung | - almost done machine shop training
- hoping to go into shop on Thursday
| |
Olabisi Sanusi | - battery mount modifications
| - also battery mount modifications
|
Chanpakorn Chaiklahan | - Machining P0092, 0232, 0233
| - Apparently camera is now in the bay for arm's camera
- P0231
|
Medina Colabrese |
|
|
Jasmine Milan | - Worked on machining for MR22-DT-P0257 and MR22-DT-P0119
- Printed MR22-EE-P0018 and MR22-EE-P0019 (Ethan Cronier)
- All camera controller parts have been printed!
| - Check commercial parts for science have been ordered
- Edit bracket for camera controller + clean folder
- Should be able to come up one day for more machining next week
- Open to helping with drawings (Austin Tailon Huang)
- Waiting on commercial parts for assembly of camera controller mechanism (Mcmaster Carr order)
|
Abdul Haseeb | |
|
Thomas Valer | - motor controller enclosure in progress
| - motor controller enclosure in progress
|
Steven Gong | Won't make it to meeting today, - Finished machining P-099
- Squared P0257, handed off to another person
| - Machine P0234 (Motor Mount Testing)
- Make more progress on Mars Lander Testing Rig CAD (will need to have help on this)
|
Conall Kingshott | | - grabbed bounty for machining
- Take apart E-Box
|
Ryan Chan | | - A2 coordination, other EE part
|
Simon Gorbet | | |
Alysha | |
|
Ash | |
|
Chris | |
|
Charmaine Chun | |
|
Joshua | |
|
Matthew Zhu | | |
Olivia Ye | - Revised A6/EE plate drawing
- Finished shop training
| |
Olivia Zheng | - Finished training drawings
| |
Ryan Mark | - Solidworks training in progress
| |
Zia | |
|
Alaina | |
|
Kenneth Francis | - A3 drawings in progress, should be done by end of week
|
|
Arlo Symons | | - Machining A4, potentially assembly
|
Gavin Mesz | - P0229 halfway done
- Revising A4 drawings
| |
Kyle Ferrier | - Finished shop training
- Team training in progress
| - Evening availability for machining
|
David | - Almost done training drawings
|
|
Sanjay |
|
|
New Tasks:
- Emptying E-Box? → Austin Tailon Huang and Conall
- E-box mounting to drivetrain → Thomas Valer
- Sub-assembly drawings (Drivetrain, Arm, Science)
- Fix Austin's motor test assembly
- Arm Mars Lander Test Fixture - Supporting Steven
Topics for Later
- Good CAD organizational practices