2022-11-08 Mechanical Meeting Minutes

Attendance

  • Austin Huang

  • Egor

  • Henrique Rodrigues

  • Chan

  • Thomas

  • Ryan

General Updates

  • masks are required


Drivetrain - @Thomas Valer

@Thomas Valer

Task Name

Updates

Action Items - Next Week

Task Name

Updates

Action Items - Next Week

Battery Mount Design

  • Review final PDR after mech meeting

  • Get design bult by end of term

  • Connect with josh about ebox

BLOCKERS:

  •  

 

@Zia Formuly Lucas and Shivraj

BLOCKERS:



@Joshua Harper

Task Name

Updates

Action Items - Next Week

Task Name

Updates

Action Items - Next Week

Drivetrain Weight Reduction

  • @Austin Tailon Huang update CAD

  • Preliminary mass budget information set up

  • Focus on ideas after the ebox pdr review

BLOCKERS:

  • CAD updates


Gimbal / Rover Comms - @Gavin Mesz

@Gavin Mesz

Task Name

Updates

Action Items - Next Week

Task Name

Updates

Action Items - Next Week

Rover Comms Tower / Gimbal Mount

  • Preliminary CAD for new design location

BLOCKERS:




EBox

@Joshua Harper

Task Name

Updates

Action Items - Next Week

Task Name

Updates

Action Items - Next Week

EBox Redesign

  • Filled in some criteria/constraints & design concept research on PDR doc

PDR - EBox Redesign 2022/23

  • Messaged Logan about component list, will discuss with him during electrical meeting tomorrow

  • fill component list doc

List of Ebox Contents 2023

  • continue researching design ideas/create prelim sketches

  • schedule a PDR

BLOCKERS:




Arm - @Austin Tailon Huang

@Ryan Mark

Task Name

Updates

Action Items - Next Week

Task Name

Updates

Action Items - Next Week

A1 Base Plate

  • Get CAD reviewed

  • Order stock

  • Machine new part

A4 Sensor Mount

  • Test proximity switches to verify usage

  • Proximity switches testing today

BLOCKERS:



@ David Choi

Task Name

Updates

Action Items - Next Week

Task Name

Updates

Action Items - Next Week

Arm Design Research

  • N/A

  • Meet with @Austin Tailon Huang

A5/A6 - Shaft Redesign

  • Machining key seats soon

A5/A6 - Structural Weight Reduction

  • @Austin Tailon Huang revisit this task when shaft redesign and encoder protection are completed.

  • N/A

A5/A6 - Encoder Protection

  • Will test and install tomorrow

BLOCKERS:

  •  

OPEN DESIGN TASKS:

Task

Interested Members

Task

Interested Members

Design Allen Key Tool Module

  • Good for new members

 

Joint Testing Plans

  • Need to develop plans to measure torque output, backlash, speed, efficiency, current draw for each arm joint

  • Plus verify end stop functionalities

  • Will start after midterms, when odrives work

  • Good for experienced members who are familiar with motor properties and motor controllers

@Chanpakorn Chaiklahan

Arm Camera Mount

  • Select a suitable camera to be mounted on the wrist

  • Requires communication with SW, simpler mechanical design task

Circle back on this one

 


Science - @Chanpakorn Chaiklahan

@Chanpakorn Chaiklahan

Task Name

Updates

Action Items - Next Week

Task Name

Updates

Action Items - Next Week

Science Assembly

  • continue assembling main frame and air manifold

  • tested binding and servo motor that lifts the air manifold

Science Sensor Dino Mount

  • Dino mount is completed

  • Parts are printed

  •  

  • Assemble, test and install dino mount

 

 

 

BLOCKERS:

  •  

@Egor Gorelyy

Task Name

Updates

Action Items - Next Week

Task Name

Updates

Action Items - Next Week

Air Manifold Assembly

  • Air manifold assembled

3D Sensor Head Mount

  • Clarify what she means by vacuum

  • She thinks 15sec submerging can work

BLOCKERS:

  • need answer for clare

@Ryan Mark

Task Name

Updates

Action Items - Next Week

Task Name

Updates

Action Items - Next Week

Remachine Science Dirt Nozzles

  • Revisit when science is fully assembled

BLOCKERS:

  • N/A

@ Lucas D’Elia and Shivraj

Task Name

Updates

Action Items - Next Week

Task Name

Updates

Action Items - Next Week

Fix Linear Carriage for Science Mechanism

  • Initial solution did not work,, reassign and redesign

OPEN DESIGN TASKS:

Task

Interested Members

Task

Interested Members

Design Mount for Science PCB

  • Good for new members, learn about PCB packaging

  • Easier design task

 


New Members:

Name

Program and Year

Training Status

Name

Program and Year

Training Status

Erin Devlin

Mechanical Engineering 2A

 

Dahui Kang

Mechatronics Engineering 1A

 

Toni Zeng

Mechatronics Engineering 1A

 

Lucas D’Elia

Mechatronics Engineering 2B

 

David Choi

Mechanical Engineering 2A

 

Megan Chang

Mechatronics Engineering 2B

 

Santiago Zea

Mechanical Engineering 2A

 

Yuming He

Mechatronics Engineering 1A

 

Henrique Rodrigues

Mechatronics Engineering 1A

 

Aathithan Karunakaran

Mechatronics Engineering 1A

 

Shivraj Singh Vishnoi

Mechatronics Engineering 2B

 

Shabd Gupta

Mechatronics Engineering 1A

 

CONFLUENCE ACCESS