Science - Remachine the air manifold nozzle heads
Due Date: Oct 8, 2022
Contributor Log
Name | Contribution |
---|---|
@Chanpakorn Chaiklahan | Task Manager |
@Ryan Mark | Owner |
Skills
Machine shop
Mechanical CAD modelling and drafting
Task Description
The nozzle heads are will be attached at the bottom of the air manifold mount and allow the dirt particle to enter the test tubes.
The current parts cannot fit into the test tubes and need to be re-machined (turn down the nozzle OD)
Task Breakdown
Review the CAD of the test tube and the nozzle heads
Take measurements of the physical test tubes and the nozzles
Create drawings and modify the CAD
Remachine the nozzles in the machine shop
Verify if the nozzles fit into the test tubes
Prerequisites
-
Progress Journal
Sep 27, 2022 @Chanpakorn Chaiklahan
Task created
Relevant Documentation Links
GrabCAD link for air manifold https://workbench.grabcad.com/workbench/projects/gcn8f4aYsA7hqFZmagsCG6WkN16C6m3vb9SV0Ko-3yav92#/file/593873894
GrabCAD link for test tube rack https://workbench.grabcad.com/workbench/projects/gcn8f4aYsA7hqFZmagsCG6WkN16C6m3vb9SV0Ko-3yav92#/file/593873846