/
A1 Base Plate Redesign
A1 Base Plate Redesign
Due Date: Aug 16, 2022
Contributor Log
Name | Contribution |
---|---|
@Austin Tailon Huang (Deactivated) | Task Manager |
@Ryan Mark | Task Owner |
Skills
Sheet metal design
Waterjet fabrication
Basic CAD Skills
Task Description
The current A1 base plate uses 4 M8 screws to mount to the drivetrain
There are concerns about stability, so we want to redesign the A1 baseplate (MR22-A1-P0042) to have more mounting holes.
Task Breakdown
Redesign base plate (MR22-A1-P0042)
Ensure new base plate properly interfaces with chassis mounting plate (MR22-DT-P0097)
Update CAD
Select new fasteners, review design
Fabricate base plate
Prerequisites
N/A
Progress Journal
Aug 16, 2022 @Austin Tailon Huang (Deactivated)
Task created
Oct 4, 2022 @Ryan Mark
Discussed in-person the backplate with Austin and Chan
Countersink fasteners would be preferred over counterbore fasteners
Too thin the metal (0.125” to have counterbore)
Relevant Documentation Links
MR22-A1-P0042 (base plate CAD)
MR22-A1-A0009 (A1 CAD)
MR22-DT-A0008 (DT CAD)
MR22-DT-P0097 (DT base plate CAD)
, multiple selections available,
Related content
Prototype 1 Part Number Registration (2021)
Prototype 1 Part Number Registration (2021)
More like this
Science-Drivetrain 3D printed mount
Science-Drivetrain 3D printed mount
More like this
E-box Redesign
E-box Redesign
Read with this
M2 Mechanical Tasks - URC 2025
M2 Mechanical Tasks - URC 2025
More like this
Mechanical Tasks (2022)
Mechanical Tasks (2022)
Read with this
2021-10-19 Meeting Minutes - Arm
2021-10-19 Meeting Minutes - Arm
More like this