9/28/2022

Weekly Updates

Member

Main Project

Update

Action Items

Member

Main Project

Update

Action Items

@Ari Wasch

BMS

  • Helping josh with BMS

  • Working on confluence

  • get new new members added to confluence

  • help josh out with BMS

Billy

 

Any update on comms research?

  • Started documenting the google drive

  • Finish going through google drive

  • Have a meeitng with @Logan Hartford

@Farris Matar

PDB/BMS

  • Assisted @Rishith Bomman with continuing PDB layout

  • Prepped signal integrity/high-speed layout tutorial

  • Continue assisting with PDB layout

  • Look into possible assemblers for the PDB

@Ivan Lim

Science

Any update on the Science document?

 

Jack

 

Update on training? Have you been through the tutorials? Got alitum working?

 

@Joshua Harper

BMS

  • BMS schematic changes and routing complete

  • Created BMS Bill of Materials (included in confluence folder)

  • BMS layout review corrections

  • Order BMS components

@Logan Hartford

Multiphase Buck Converter

  • Went to the bay with @Paul Kokhanov this weekend and assembled one of the bucks. Powered it with 30V and it is outputting 24V but we are blocked on testing further until we get some new power supplies.

  • Ordered some small stuff

  • Researched power supplies

  • Hopefully pull the trigger on an adjustable power supply

  • Learn how to use the current sense board, or order a current sense resistor

  • Maybe buy some more stuff

    • Thermal gun/ camera

    • Project drawers

    • ESD bags

    • Low gauge wire

Olivia

 

Any Updates on the New Parts project? Any update on learning about the BMS?

  • Found a new LED

  • Looked at some CAN alternatives

  • Started going through the BMS schematics

  • Finshed altium tutorials

  • finalize new CAN

  • Work through BMS schematic

  • Design reviews

@Paul Kokhanov

Multiphase Buck Converter

Any update on assembly and testing of the buck?

 

Rayaan Mahmood

 

Any Updates on the New Parts project? Any update on learning about eh PDB?

  • Found a new LED

  • Looked at some CAN alternatives

  • Went through PDB documents

  • Design review

  • HAve a meeting with @Logan Hartford about PDB

  • finalize CAN parts

@Rishith Bomman

PDB

Any update on the PDB layout?

  • Basically done layout

  • Get it out for layout review

@Wolfgang Windholtz (Deactivated)

Science & Support

Any updates on New Parts?

  • did Stuff with new members

  • worlfy can do design reviews on Thursday Friday and Sunday

Announcements:

  • Who is available to do layout reviews in the next 2-3 days?

Active Projects:

Project

Currently Assigned To

Ticket

Due Date

Comments

Priority Level

Project

Currently Assigned To

Ticket

Due Date

Comments

Priority Level

PDB

@Rishith Bomman /

@Farris Matar / Rayaan

Oct 31, 2022

  • Need to complete layout reviews by Oct 2, 2022 and ordered the boards on Oct 3, 2022

HIGH

Multiphase Buck

@Paul Kokhanov / @Logan Hartford

Oct 31, 2022

  • Blocked on testing until we get a new power supply

HIGH

BMS

@Joshua Harper / @Ari Wasch / Olivia

Oct 31, 2022

  • Need to complete layout reviews by Oct 2, 2022 and ordered the boards on Oct 3, 2022

HIGH

Comms

billy / @Logan Hartford

Oct 31, 2022

  • Found old google drive, Billy is working through it

HIGH

Science

 

Nov 26, 2022

  • Need one or two people to own the assembly and testing of the science boards and work with @Ivan Lim and @Wolfgang Windholtz (Deactivated) to ensure the board is ready for competition.

  • Found two assembled boards but none of the parts if @Ivan Lim / @Wolfgang Windholtz (Deactivated) have any ideas please let me know. Otherwise we’ll just order more parts.

  • @Ivan Lim / @Wolfgang Windholtz (Deactivated) Both of the assembled boards are missing a lot of parts, do the boards have a bunch of population options?

MEDIUM

SPI LVDS

 

Nov 26, 2022

  • Need one or two people to own the assembly and testing of the SPI LVDS boards.

  • Did not find any boards or parts for the peripheral boards

    • If anyone has any idea where these might be please let me know asap otherwise we will order new boards and parts.

  • Found only blank boards and assembled boards for the host boards

    • If anyone has any idea where the parts are please let me know asap or we will order new parts.

MEDIUM

RS422

 

Nov 26, 2022

  • Need one or two people to own the assembly and testing of the RS422 boards.

  • Found parts, boards and stencil, can start assembling immediately

  • Don’t know how many boards we have parts for but we can assembly what we can now and order more after.

MEDIUM

New Parts

@Wolfgang Windholtz (Deactivated) / Rayaan / Oliva

Nov 26, 2022

  • Need one or two people to own finding a new CAN receiver and LED and work with @Wolfgang Windholtz (Deactivated) to add the parts to the UWRT schematic and footprint library

MEDIUM