2/15/2023

Weekly Updates

Member

Main Project

Status

Update

Action Items

Member

Main Project

Status

Update

Action Items

@Ari Wasch

BMS

 

 

David Choi

DD Current Sense / Comms

✅🚹

Any update on the DD Current Sense part selection? Any update on Comms?

  • Set up comms for software--untested

  • Making RS422 wires for firmware

  • Ordered new boards for RS422

  • Making wires

  • Focusing on firmware until SAR

@Farris Matar

PDB/OTS BMS

✅🚹

  • Ordered charger – recieved

    • got everything to wire itup

    • making cables

    • main power cables done

 

  • Setup battery to charger connections

  • getting charge/bms to work

@Logan Hartford

Lead

  • Finished setting up Altium team licenses

  • Signed up for Altiums training curriculum

  • Made guide for getting power rails up

  • Discussed new onboarding stream with peter:

    • 1. training

    • 2. testing and integration workshop

    • 3. getting started with altium

    • 4. cookie cutter, full term board design project

      • Make project collaborative

        • altium 365

      • compare work at regular deadlines, review each other, then reviewed by senior

      • Work session should be grunt work--is the collaborative period

    • 5. Resume and application workshops

      • Farris’s cohort has an interview question bank

    • 6. novel PCB design projects

    • 7. keeping people engaged with the team

  • Review the new DD current sense schematic if avaialble

  • 5V layout review

  • Create a presentation for testing and integration workshop

  • brainstorm some good cookie cutter board projects

    • code with me style or just list tasks and provide necessary instructions

    • One small part is code w me then move to something more advanced and apply the principle

    • Reading datasheets

    • Calculations

    • Mention the fundamental of the electrical concepts-why math works

    • keep within the scope of board design

    • Have a repository of concept explanations

  • Reading week next week

  • Make a better wiring diagram with Draw.io

  • Ideas:

    • communication protocol--use osciliscope

    • I2C multiplexer

    • roulette board-555 timer--LED roulette board

    • DD current sense board but simpler

    • simple sensor board

  • Set up meeting with Rishith

  • Report

  • drivetrain by sunday

  • electrical support needed

Muhammad Tanveer

Comms

✅🚹

Any update on Comms?

 

Rayaan

5V OTS Buck

Any update on the power replacements?

  • Met with Billy about the DD current sense board

  • Set up a meeting for the weekend

  •  

  • Set a meeting meeting for reimbursment

  • Meet with billy

@Rishith Bomman

PDB

✅🚹

Any updates on PDB Rev 4.1?

  • Went through comments in layout revie

  • add new load monitoring sw’s

@Wolfgang Windholtz (Deactivated)

Science / Support

 

 

@Yuchen Lin

DD Current Sense / Comms

Any update on the DD Current Sense part selection? Any update on Comms?

  • Had a meeting with Rayaan

  • This Saturday will be designing the board together

  • Would like to participate in the onboarding board

Priority I Tasks:

Task

Discussion Questions

Answers

Assigned To

Task

Discussion Questions

Answers

Assigned To

Get the bare minimum electrical systems working for the drive train to be able to move
  • What is the bare minimum electrical system?

  • What are all the all the ways we can achieve this?

  • New requirements--Need to power:

    • Jetson - 17V, 10W-30W

    • Gimbal

      • Search up nominal voltage and current draw for gimbal motor

      • Zed2: 380mA @5V

    • Vector Nav - 5V, 250 mA

    • Anenna - 24V 1.5A

    • Pi - 5V 3A

    • What are the power requirements for each of these?

  • Encoders need 5V, mostly a current ref

    • 20mA per encoder

    • 48-5V buck

  • 48V to each motor

  • Apparently the Odrive supplies 5V to the encoders so no need for a buck

Total SAR Power Requirments

17V - 4A
5V - 380 + 250 + 3A => 4A
24V - 1.5A

Rayaan

Validate the OTS BMS
  • How can this be done?

  • How easy of a project is this?

  • 3/5 tough

  • Use resistors divider board to validate basic functions

    • For checking over-voltage?

    • Hook up the cells to the BMS and test basic functions

  • Someone has definitely done battery emulation before

    • google it

@Farris Matar (starting next week)

Create a SOP document for how to charge the LiPo battery pack
  • With vs without the BMS

  • What is the safest way?

  • What is the most convenient way?

  • Any concerns?

  • Should always charge it using a battery charger

  • Have the BMS hooked up as well

  • Connector solution

  • Put safety warnings, storage instructions etc

@Yuchen Lin

Complete Rev 4.1 of PDB
  • Do we have time for a work session this weekend?

  • Yes

Rishith

Validate the electrical functionality of the LED matrix
  • What exactly does this consist of?

  • What needs to be done to verify?

  • Send a digital signal to the neopixels, bitshifts

  • Just need to hit it with PWM to set the colour of the whole thing

    • arduino town

@David Choi / Rishith

/ @Farris Matar

 

  • working on instability issue

    • Should be fine with one antena

@David Choi

Priority II/III Tasks:

Task

Priority

Status

Comments

Task

Priority

Status

Comments

II

Waiting on mechanical/firmware

 

II

Waiting on mechanical/firmware

 

III

Working on priority I comms first

 

II

Working on priority I comms first

 

Active Projects:

Project

Currently Assigned To

Ticket

Due Date

Comments

Priority Level

Project

Currently Assigned To

Ticket

Due Date

Comments

Priority Level

PDB

@Rishith Bomman /

@Farris Matar / Rayaan

PDB Rev4 - Design and Assemble the PDB

Dec 19, 2022

  • Performance testing complete

  • Some small schematic and footprint issues across the board

  • 17V performed well except on start up

  • 5V is very noisey

HIGH

BMS

@Joshua Harper / @Ari Wasch / Olivia

BMS - Design and Assemble the BMS

Apr 19, 2023

  • One BMS has been assembled

  • Basic non-performacne and non-firmware tests have been done

  • An off the shelf replacement is being sourced

HIGH

Comms

@Yuchen Lin / @Logan Hartford

Comms

Oct 31, 2022

 

HIGH

Science

 

Science - Assemble & Test

Apr 19, 2023

  • Need one or two people to own the assembly and testing of the science boards and work with @Ivan Lim and @Wolfgang Windholtz (Deactivated) to ensure the board is ready for competition.

  • Found two assembled boards but none of the parts if @Ivan Lim / @Wolfgang Windholtz (Deactivated) have any ideas please let me know. Otherwise we’ll just order more parts.

  • @Ivan Lim / @Wolfgang Windholtz (Deactivated) Both of the assembled boards are missing a lot of parts, do the boards have a bunch of population options?

MEDIUM

SPI LVDS

@Farris Matar

SPI LVDS - Assemble and Test

Apr 19, 2023

  • SPI LVDS Host boards should have been assembled

  • SPI LVDS Peripheral parts and boards should be in the bay now, pending assembly

  • Harnesses need to be ordered in order to wire them up together and do testing

MEDIUM

RS422

David Choi / @Farris Matar

RS422 - Assemble and Test

Apr 19, 2023

  • @Farris Matar verified the design and was able to send data using the boards

  • 3 Boards have been assembled and tested

MEDIUM

LED Matrix

 

LED Matrix 2022/23

Apr 19, 2023

  • LED matrix has been located

  • Should work, just needs power and a PWM signal

MEDIUM

Digital Display Current Sense Board

@Olivia Markham (Deactivated) / David Choi / @Yuchen Lin

Current Sense Display

Apr 19, 2023

  • Currently in the schematic design phase of the project

LOW