BMS

 

 

David Choi

DD Current Sense / Comms

✅🚹

Any update on the DD Current Sense part selection? Any update on Comms?

  • Set up a one antenna set up for software

  • Make more RS422 boards

  • DD current sense

 

@Farris Matar

PDB/OTS BMS

✅🚹

  • Reviewed current sense schematic

  • Looked for the battery

    • Gunna have to get a new one

  • Work on how to use the BMS

@Logan Hartford

Lead

  • Met with some people from the team to discuss how to properly set up an altium project

  • Met with Peter to discuss re-vamping our onboarding process

  • Didn’t get a whole lot done this week, will try and get some stuff done the weekend

  • Reveiw 5V layout

  • Get team licenses sorted out

  • Make a parts creation and project creation page in confluence

  • Try and streamline the training process a bit

  • Work with Rayaan to get everything order for the MVP power set up

    • Sunday morning

  • Meet with David for RS422

  • Meet with billy on sunday

Muhammad Tanveer

Comms

✅🚹

Any update on Comms?

 

Rayaan

5V OTS Buck

Any update on the power replacements?

  • Found a suitable 17V buck

  • Look into the Zed2 power

  • Meet with @Logan Hartford

@Rishith Bomman

PDB

✅🚹

Any updates on PDB Rev 4.1?

 

@Wolfgang Windholtz (Deactivated)

Science / Support

 

 

@Yuchen Lin

DD Current Sense / Comms

Any update on the DD Current Sense part selection? Any update on Comms?

  • I see the format for sop and will look into it and create a more detailed document for battery charging

  • will continue to talk to Formular EE for battery charging(maybe need to have a meeting to talk about it?)

  • meeting with you on Sunday to learn the proper way of creating a git project

  • meeting with Farris on Monday and learn some electronics basics + how to understand the data sheet and create the correct schematic

 

Announcements:

  • Review the SOP battery charging document

Priority I Tasks:

Task

Discussion Questions

Answers

Assigned To

Task

Discussion Questions

Answers

Assigned To

Get the bare minimum electrical systems working for the drive train to be able to move
  • What is the bare minimum electrical system?

  • What are all the all the ways we can achieve this?

  • New requirements--Need to power:

    • Jetson - 17V, 10W-30W

    • Gimbal

      • Search up nominal voltage and current draw for gimbal motor

      • Zed2: 380mA @5V

    • Vector Nav - 5V, 250 mA

    • Anenna - 24V 1.5A

    • Pi - 5V 3A

    • What are the power requirements for each of these?

  • Encoders need 5V, mostly a current ref

    • 20mA per encoder

    • 48-5V buck

  • 48V to each motor

  • Apparently the Odrive supplies 5V to the encoders so no need for a buck

Total SAR Power Requirments (strikeout means secured)

17V - 4A
5V - 380 + 250 + 3A => 4A
24V - 1.5A

Rayaan

Validate the OTS BMS
  • How can this be done?

  • How easy of a project is this?

  • 3/5 tough

  • Use resistors divider board to validate basic functions

    • For checking over-voltage?

    • Hook up the cells to the BMS and test basic functions

  • Someone has definitely done battery emulation before

    • google it

@Farris Matar (starting next week)

Create a SOP document for how to charge the LiPo battery pack
  • With vs without the BMS

  • What is the safest way?

  • What is the most convenient way?

  • Any concerns?

  • Should always charge it using a battery charger

  • Have the BMS hooked up as well

  • Connector solution

  • Put safety warnings, storage instructions etc

@Yuchen Lin

Complete Rev 4.1 of PDB
  • Do we have time for a work session this weekend?

  • Yes

Rishith

Validate the electrical functionality of the LED matrix
  • What exactly does this consist of?

  • What needs to be done to verify?

  • Send a digital signal to the neopixels, bitshifts

  • Just need to hit it with PWM to set the colour of the whole thing

    • arduino town

@David Choi / Rishith

/ @Farris Matar

 

  • working on instability issue

    • Should be fine with one antena

@David Choi

Priority II/III Tasks:

Task

Priority

Status

Comments

Task

Priority

Status

Comments

II

Waiting on mechanical/firmware

 

II

Waiting on mechanical/firmware

 

III

Working on priority I comms first

 

II

Working on priority I comms first

 

Active Projects:

Project

Currently Assigned To

Ticket

Due Date

Comments

Priority Level

Project

Currently Assigned To

Ticket

Due Date

Comments

Priority Level

PDB

@Rishith Bomman /

@Farris Matar / Rayaan

PDB Rev4 - Design and Assemble the PDB

Dec 19, 2022

  • Performance testing complete

  • Some small schematic and footprint issues across the board

  • 17V performed well except on start up

  • 5V is very noisey

HIGH

BMS

@Joshua Harper / @Ari Wasch / Olivia

BMS - Design and Assemble the BMS

Apr 19, 2023

  • One BMS has been assembled

  • Basic non-performacne and non-firmware tests have been done

  • An off the shelf replacement is being sourced

HIGH

Comms

@Yuchen Lin / @Logan Hartford

Comms

Oct 31, 2022

 

HIGH

Science

 

Science - Assemble & Test

Apr 19, 2023

  • Need one or two people to own the assembly and testing of the science boards and work with @Ivan Lim and @Wolfgang Windholtz (Deactivated) to ensure the board is ready for competition.

  • Found two assembled boards but none of the parts if @Ivan Lim / @Wolfgang Windholtz (Deactivated) have any ideas please let me know. Otherwise we’ll just order more parts.

  • @Ivan Lim / @Wolfgang Windholtz (Deactivated) Both of the assembled boards are missing a lot of parts, do the boards have a bunch of population options?

MEDIUM

SPI LVDS

@Farris Matar

SPI LVDS - Assemble and Test

Apr 19, 2023

  • SPI LVDS Host boards should have been assembled

  • SPI LVDS Peripheral parts and boards should be in the bay now, pending assembly

  • Harnesses need to be ordered in order to wire them up together and do testing

MEDIUM

RS422

David Choi / @Farris Matar

RS422 - Assemble and Test

Apr 19, 2023

  • @Farris Matar verified the design and was able to send data using the boards

  • 3 Boards have been assembled and tested

MEDIUM

LED Matrix

 

LED Matrix 2022/23

Apr 19, 2023

  • LED matrix has been located

  • Should work, just needs power and a PWM signal

MEDIUM

Digital Display Current Sense Board

@Olivia Markham (Deactivated) / David Choi / @Yuchen Lin

Current Sense Display

Apr 19, 2023

  • Currently in the schematic design phase of the project

LOW