11/30/2022

11/30/2022

 

Weekly Updates

Member

Main Project

Update

Action Items

Member

Main Project

Update

Action Items

Ari Wasch (Deactivated)

BMS

  • Start working on some documentation

 

David Choi

RS422 / Comms

Any update on the DD Current Sense part selection?

  • Did reading on 7 seg – comparators

    • Couldn't find a good example online

  • Did some comms readings

 

Farris Matar (Deactivated)

PDB/BMS

  • Work session this weekend in the bay to assemble and potentially test the SPI Peripheral boards

Joshua Harper

E-Box

 

 

Logan Hartford (Deactivated)

Multiphase Buck Converter

  • Ordered

    • 3V3 bucks for the BMS

    • 5 computer power cords

    • 2 scaples with blades

  • Worked with Wolfgang Windholtz (Deactivated) and tested the PDB

    • 5V has been fully tested and works, though it is very noisey

  • Work Session Stuff:

    • Fully test PDB

    • Assemble and test more RS422’s

  • Meet with Olivia, David and Yuchen and discuss DD current sense project

    • Should start meeting weekly on this and make some progress

  • Will do 17V basic testing on Friday, then Wolfgang Windholtz (Deactivated) and Farris Matar (Deactivated) can help with the more advanced stuff on Saturday

  • Grab SPI boards

  • Verify 17V load sw with N-CH

Muhammad Tanveer

Comms

Any update on comms? Any update on the BMS back up?

 

Olivia Markham

BMS / DD Current Sense

Any update on the DD Current Sense part selection?

  • focusing on finishing school work and studying for exams for now

Rishith Bomman (Deactivated)

PDB

Any updates?

  •  

 

Wolfgang Windholtz (Deactivated)

Science / Support

5V testing

  • Probed pdb on 5V line

    • 12V pk-pk ripple on sw node

    • ripple coupled to 48V and gnd power plane

    • input ripple of 12v pk-pk

  • Added snubber to gate of fet

    • added a bit out output capacitance

    • added a bit of input capacitance

    • helped a bit

  • odrive support

  • PDB testing/support

Yuchen Lin

Comms

Any update on comms?

  • identify the end of term goal

  • setting up site to site communication under vpn

  • bench testing and vertifying the point to point communication

  • A little bit busy on school work.

  • Please update the comms ticket with developments in the progress updates section, should only take 10 min Comms

  • Finish setting up site to site communication

  • verify the test

  • update the document

  • will be holding a meeting for comms next term.

Announcements:

  • Work Session This Saturday 9 am-?? – Logan Hartford (Deactivated) has to leave at like 2 pm

  • Is anyone interested in helping or fully leading the electrical team next term? Role descriptions here: Electrical Lead Role Description

  • We will have one more remote meeting next Wednesday and then that will be it for the rest of the term.

    • We may do a sync-up meeting over the Christmas break but meetings will not likely resume until the new year.

Active Projects:

Project

Currently Assigned To

Ticket

Due Date

Comments

Priority Level

Project

Currently Assigned To

Ticket

Due Date

Comments

Priority Level

PDB

Rishith Bomman (Deactivated) /

Farris Matar (Deactivated) / Rayaan

PDB Rev4 - Design and Assemble the PDB

Dec 19, 2022

  • Two PDBs have been assembled, one of them is prettier than the other

  • Basic non-performacne and non-firmware tests have been done

  • Looking like another revision may be necessary, we determine for sure after tests are fully complete

HIGH

Multiphase Buck

Paul Kokhanov (Deactivated) / Logan Hartford (Deactivated)

Multiphase Buck Converter Rev 2 - Design and Assemble the Buck Converter

DISCONTINUED

  • Tested over reading week, something is wrong, haven’t determined the root cause of the issue

  • An off the shelf back up has been sourced

HIGH

BMS

Joshua Harper / Ari Wasch (Deactivated) / Olivia

BMS - Design and Assemble the BMS

Apr 19, 2023

  • One BMS has been assembled

  • Basic non-performacne and non-firmware tests have been done

  • An off the shelf replacement is being sourced

HIGH

Comms

Yuchen Lin / Logan Hartford (Deactivated)

Comms

Oct 31, 2022

  • New edge routers have been purchased and configured

  • We are able to send data

  • Looking to do a range test

HIGH

Science

 

Science - Assemble & Test

Apr 19, 2023

  • Need one or two people to own the assembly and testing of the science boards and work with Ivan Lim (Deactivated) and Wolfgang Windholtz (Deactivated) to ensure the board is ready for competition.

  • Found two assembled boards but none of the parts if Ivan Lim (Deactivated) / Wolfgang Windholtz (Deactivated) have any ideas please let me know. Otherwise we’ll just order more parts.

  • Ivan Lim (Deactivated) / Wolfgang Windholtz (Deactivated) Both of the assembled boards are missing a lot of parts, do the boards have a bunch of population options?

MEDIUM

SPI LVDS

Farris Matar (Deactivated)

SPI LVDS - Assemble and Test

Apr 19, 2023

  • Need one or two people to own the assembly and testing of the SPI LVDS boards.

  • There are assembled host boards in the bay

  • Parts and boards have been ordered for the peripheral boards

MEDIUM

RS422

David Choi / Farris Matar (Deactivated)

RS422 - Assemble and Test

Apr 19, 2023

  • Farris Matar (Deactivated) verified the design and was able to send data using the boards

  • 3 Boards have been assembled and tested

  • There are parts and boards for 5 more in the bay

MEDIUM

LED Matrix

 

LED Matrix 2022/23

Apr 19, 2023

  • LED matrix has been located

  • Should work, just needs power and a PWM signal

MEDIUM

Digital Display Current Sense Board

Olivia Markham / David Choi / Yuchen Lin

Current Sense Display

Apr 19, 2023

  • Currently in the part selection phase of the project

LOW