Electrical Team Task Tracker (2021-2022)

Electrical Team Task Tracker (2021-2022)

Equipment Wishlist

All equipment purchased must be CSA approved, otherwise we will have to pay to get it inspected (which is never worth the money).

PCB Tracking

PCB/System

Responsible Member(s)

Schematic Capture

Schematic Review

PCB Layout

Layout Review

Parts Order

PCB Ordered

Test Plan Created

PCB Assembled

PCB Tested

PCB/System

Responsible Member(s)

Schematic Capture

Schematic Review

PCB Layout

Layout Review

Parts Order

PCB Ordered

Test Plan Created

PCB Assembled

PCB Tested

Power Distribution Board + Battery Management System (PDB + BMS)

@Farris Matar (Deactivated) @Ari Wasch (Deactivated)

48V-24V Multiphase Buck Rev2

@Logan Hartford (Deactivated)

Science

@Wolfgang Windholtz (Deactivated) @Ivan Lim

Jetson Carrier

@Chealsie Bains (Deactivated)

RS422 Breakout Board

@Jason Gao (Deactivated)

SPI LVDS Master Breakout Board

@Jason Gao (Deactivated) @Taylor Mcnabb (Deactivated)

SPI LVDS Slave Breakout Board

@Jason Gao (Deactivated) @Taylor Mcnabb (Deactivated)

Brushless DC Motor (BLDC Motor) Controller Board

@Jason Gao (Deactivated)