  • How many parts left to fabricate?

    • 3 chassis pieces opened up

    • waterjet parts

    • 3D printed parts

    • 1 CNC part

  • Most parts Machined!

  • Looseness with tubes?

    • sorted with shims

  • assembly drawings?

  • When is assembly occuring?

    • right after machining

  • What is being blocked

    • gearboxes

    • demtool orders

 

  • demtool

    • should be here next week Monday (7th)

  • Mcmaster parts coming in tomorrow

    • post op machining on some parts


Arm

  • machining? - another pass of the drawings required

    • who is maching? - everyone check bounties

    • what needs to be machined (priority)

      • axis 1 priority

  • What is the plan with the Gearbox? (axis 2)

    • adapter plate to fix the arm

  • Maxon motors arrived!


Gimbal

  • overall update?

    • need to get the gimbal back


E-box

  • Dis-assembled

  • Ready for firmware


Science

  • Problem with test tube

    • Gavin is sorting it out

  • Rest of bom to fabricate

  • CPI Automation stuff on its way? 1-2 more weeks till stuff should be here

  • Servo City stuff ordered? - not yet

  • needs assy drawings (several)

  • needs cut length drawing


Gripper

  • 1 part left to fabricate

  • pending Misumi Parts

  • pending Assembly

  • Use of random encoder

  • Send to firmware team

  • needs assy drawing (1)


Orders

  • What stuff is ordered and when will it arrive (estimate)

    • CPI Automation stuff: 1-2 weeks from now

  • DF robot stuff ordered

 

Electrical

  • Status on boards

    • science board?

  • wiring diagram - should be done by now

  • 12awg/8awg purchased yet?

  • battery charger selected! - borrow from graeme

  • comms tested?

  • SPI Master board finished?

  • PDM and RS422 ordered?

  • E-box ready for EE

Firmware

  • firmware suitable for broadcoms?

  • odrive motor controller tested?

  • missing blackfly found?

  • motor fixture made yet?

Software

  • Arm Progress? - testable?

  • CAN API progress?

  • Time to work on science yet?

Science

  • Has Ninhydrin test been documented?

    • fully documented

  • Has experimental procedure been documented?

    • fully documented

  • Physical testing?

    • chemicals present

    • lab equipment? - lab or own material?

      • maybe check SciSoc

  • SDS sheets?

    • all sheets ready

    • need to print and run them in

    • put SDS sheets in the binder behind the door

Business

STAR GOALS

Specific, Testable, Attainable, Relevant

Mechanical

  • Sort out PLA

  • Sort out RLS

  • Drivetrain

    • CNC parts

    • Waterjet Parts

    • Order ESMS COTS parts (not stock)

  • Arm

    • Teach people waterjet - Assign to Mathew Zhu

    • Drawings just check for good enough

    • assembly drawings 1, 2, 3, 4

  • Order Servo City Stuff this week

Electrical

  •  

Firmware

  •  

Software

  •  

Science

  • Get SDS sheets to bay

  • Meet with team to start working on SAR document

 

Leads

 

  • do our OWN sar?

    • for team milestones

    • practice

    • pace

General

  • Safety Captain?

  • Battery over border?

  • RLS Encoders where are they

 

 

  • Letter to the dean for week if there is more than 120 days between purchase and submittal.

    • tldr just submit as soon as you can