Bogie Remanufacturing
Bogie Remanufacturing
Process
The front end of the rocker bogie system was dismantled to examine and determine what was causing the misalignment in the tires.
Bogie separated from the rover
Observations
When placed into the epoxy jig, using a level we can see that while the center and one end of the bogie are parallel to the floor, the opposite side is not.
R2 (left), bogie pivot (center), R3 (right)
Next steps
The carbon fiber tubing will be cut between the aluminum joints, and any residue will be sanded off. Preparation for epoxying will begin.
, multiple selections available,
Related content
Right Rocker Remanufacturing
Right Rocker Remanufacturing
More like this
2022-01-11 - Mechanical Meeting Minutes
2022-01-11 - Mechanical Meeting Minutes
More like this
Analyzing Rocker-bogie Suspension Mechanism
Analyzing Rocker-bogie Suspension Mechanism
More like this
Drivetrain and Chassis (2021-2022)
Drivetrain and Chassis (2021-2022)
More like this
2021-11-09 Meeting Minutes - Drivetrain Review w/ Ping
2021-11-09 Meeting Minutes - Drivetrain Review w/ Ping
More like this
M5 Mechanical Tasks - URC 2025
M5 Mechanical Tasks - URC 2025
More like this