Ebox Redesign (Mechanical - 2025)
Due Date: Aug 16, 2022
Contributor Log
Name | Contribution |
---|---|
|
|
|
|
Skills
Electrical Schematic Design
Mechanical Design
Sheet metal design and manufacturing method
Task Description
Redesign the electrical box to fit the needs of the current rover better.
Manufacturing will be done with Protocase (sponsor of URC)
Specifically, incorporate the following requirements into the existing design
Referencing full system architecture diagram, design intentional and robust mounting structure for every electrical components
Develop CAD representation for critical wire harnessing and routing
Implement wire ducts for
Mount 2x EStops to the side of the Ebox
Identify and specify spatial placement of sponsor logo
Task Breakdown
Prerequisites
Talk to Billy about any electrical components that might be changed
Progress Journal
Aug 16, 2024 @Saheed Quadri (date and name)
brief update on whats done and what are the next steps, photos and images and videos are preferred
Etc.
Relevant Documentation Links
Data sheets, CAD model numbers, etc?