Overview:

  • The objective of the project

Requirements:

  • At least 4 DOF

  • 5 kg payload carrying performance (static and dynamic torque)

  • No motor overheat

  • Ability to move freely in 3D space

  • At least able to reach a workspace area

  • Control mode

    • User direct input through the joystick

    • Given two points in space and move

  • ROS 2 package for advanced motion planning

  • camera feedback for the operator to view

 

Constraint:

  • On-going discussion: the current arm spec is way under the calculation(Need to re-evaluate the current situation)

    • The software will not be able to integrate the ARM(mech side) soon (software tightened timeline)

  • The integration and the next step of development might be to try out and re-evaluate and then make limited improvement

    • Impact: need to evaluate the performance and establish constraints based on the observation

 

Nice to have:

  • Able to switch end effector and accomplish the competition requirement action

  • For carrying mission offload payload to a storage area and transport

Interface:

  • User command input:

    • joystick

    • Position control input

  • Output:

    • User camera feed

Design validation discussion

  • Arm system road blocker

    • Communication with Austin on the way

    • Need to consult with people with more realization about the system

    • Company (anoop's help?)

Architecture: (will be updated after motor respec and system reevaluation)

Insert mechanical model picture here(if possible)

Insert a system diagram:

  • Main electrical components

  • High-level software controller

  • introduce how each part interact with each other

Insert a software sequence diagram:

 

Timeline

  • define major milestone(decouple all the parts)

  • three stage

    • design

    • MVP

    • cleanup

  • Demonstration date

  • Link to subteam tasks lists and assignee document

Risk mitigation

Subtasks

Status

Impact evaluation

alternative solution

Max allowance time

Subtasks

Status

Impact evaluation

alternative solution

Max allowance time

 

danger

??? the impact have not been understood

on track

High will affect multiple system functionality

Medium will affect one or two low-priority system

Low does not affect the rest of the system

  • plan A

    • advantage:

    • disadvantage:

    • cost

    • Required time:

 

 

 

 

 

 

 

Inventory

Item Name

Status

Cost

referencing document

Item Name

Status

Cost

referencing document

Insert the product name here

Planning

ordered

tested

installed

$

  • datasheet

  • user manual

 

 

 

 

 

Update & Action Items

Member

Update

Action Items

Member

Update

Action Items

 

 

 

 

New Tasks

General Notes

Project ownership(person to contact)

Name of the person (Onsite/ Remote)