Project Arm
Overview:
The objective of the project
Requirements:
At least 4 DOF
5 kg payload carrying performance (static and dynamic torque)
No motor overheat
Ability to move freely in 3D space
At least able to reach a workspace area
Control mode
User direct input through the joystick
Given two points in space and move
ROS 2 package for advanced motion planning
camera feedback for the operator to view
Constraint:
On-going discussion: the current arm spec is way under the calculation(Need to re-evaluate the current situation)
The software will not be able to integrate the ARM(mech side) soon (software tightened timeline)
The integration and the next step of development might be to try out and re-evaluate and then make limited improvement
Impact: need to evaluate the performance and establish constraints based on the observation
Nice to have:
Able to switch end effector and accomplish the competition requirement action
For carrying mission offload payload to a storage area and transport
Interface:
User command input:
joystick
Position control input
Output:
User camera feed
Design validation discussion
Communication with Austin on the way
Need to consult with people with more realization about the system
Company (anoop's help?)
Architecture: (will be updated after motor respec and system reevaluation)
Insert mechanical model picture here(if possible)
Insert a system diagram:
Main electrical components
High-level software controller
introduce how each part interact with each other
Insert a software sequence diagram:
Timeline
define major milestone(decouple all the parts)
three stage
design
MVP
cleanup
Demonstration date
Link to subteam tasks lists and assignee document
Risk mitigation
Subtasks | Status | Impact evaluation | alternative solution | Max allowance time |
|---|---|---|---|---|
| danger ??? the impact have not been understood on track | High will affect multiple system functionality Medium will affect one or two low-priority system Low does not affect the rest of the system |
|
|
|
|
|
|
|
Inventory
Item Name | Status | Cost | referencing document |
|---|---|---|---|
Insert the product name here | Planning ordered tested installed | $ |
|
|
|
|
|
Update & Action Items
Member | Update | Action Items |
|---|---|---|
|
|
|
New Tasks
General Notes
Project ownership(person to contact)
Name of the person (Onsite/ Remote)