Project Arm
Overview:
- The objective of the project
Requirements:
- At least 4 DOF
- 5 kg payload carrying performance (static and dynamic torque)
- No motor overheat
- Ability to move freely in 3D space
- At least able to reach a workspace area
- Control mode
- User direct input through the joystick
- Given two points in space and move
- ROS 2 package for advanced motion planning
- camera feedback for the operator to view
Constraint:
- On-going discussion: the current arm spec is way under the calculation(Need to re-evaluate the current situation)
- The software will not be able to integrate the ARM(mech side) soon (software tightened timeline)
- The integration and the next step of development might be to try out and re-evaluate and then make limited improvement
- Impact: need to evaluate the performance and establish constraints based on the observation
Nice to have:
- Able to switch end effector and accomplish the competition requirement action
- For carrying mission offload payload to a storage area and transport
Interface:
- User command input:
- joystick
- Position control input
- Output:
- User camera feed
Design validation discussion
- Arm system road blocker
- Communication with Austin on the way
- Need to consult with people with more realization about the system
- Company (anoop's help?)
Architecture: (will be updated after motor respec and system reevaluation)
Insert mechanical model picture here(if possible)
Insert a system diagram:
- Main electrical components
- High-level software controller
- introduce how each part interact with each other
Insert a software sequence diagram:
Timeline
- define major milestone(decouple all the parts)
- three stage
- design
- MVP
- cleanup
- Demonstration date
- Link to subteam tasks lists and assignee document
Risk mitigation
Subtasks | Status | Impact evaluation | alternative solution | Max allowance time |
---|---|---|---|---|
DANGER ??? the impact have not been understood ON TRACK | HIGH will affect multiple system functionality MEDIUM will affect one or two low-priority system LOW does not affect the rest of the system |
| ||
Inventory
Item Name | Status | Cost | referencing document |
---|---|---|---|
Insert the product name here | PLANNING ORDERED TESTED INSTALLED | $ |
|
Update & Action Items
Member | Update | Action Items |
---|---|---|
New Tasks
General Notes
Project ownership(person to contact)
Name of the person (Onsite/ Remote)