Overview:
- The objective of the project
Requirements:
- 1 KM Beyond Visual Line of Sight
- Two Data Link:
- 900 Mhz emergency fallback
- 5.8 Ghz High bandwidth video and control signal communication
- Good antenna clearance
- Re-establish connection after link failed
Constraint:
- Due to limited bandwidth currently in Mech, the 5.8 Ghz directional antenna router needs to be designed in a black box solution.
Nice to have:
- link quality monitoring
- 5.8 Ghz router using AHRS to keep pointing at ground station
Interface:
- 900 Mhz USB connection to the system
- 5.8 Ghz Ethernet connection to the system
- Both transmit and receive TCP packet, which encodes the ROS2 topic
Design validation decussion
- insert the meeting minutes for all the discussion
Architecture:
Insert mechanical model picture here(if possible)
Insert a system diagram:
- Main electrical components
- High-level software controller
- introduce how each part interact with each other
Insert a software sequence diagram:
Timeline
- define major milestone(decouple all the parts)
- three stage
- design
- MVP
- cleanup
- Demonstration date
- Link to subteam tasks lists and assignee document
Risk mitigation
Subtasks | Status | Impact evaluation | alternative solution | Max allowance time |
---|---|---|---|---|
DANGER ??? the impact have not been understood ON TRACK | HIGH will affect multiple system functionality MEDIUM will affect one or two low-priority system LOW does not affect the rest of the system |
| ||
Inventory
Item Name | Status | Cost | referencing document |
---|---|---|---|
Insert the product name here | PLANNING ORDERED TESTED INSTALLED | $ |
|
Update & Action Items
Member | Update | Action Items |
---|---|---|
New Tasks
General Notes
Project ownership(person to contact)
Name of the person (Onsite/ Remote)