Base Board Rev5 Design Notes

Schematic Changes:

  • Separating the load monitoring, voltage monitoring and outputs for all of the rails into different sheets

5V Power Distribution

Component

Current

Component

Current

Raspberry Pi

2A

Gimbal

??

Zed2 Camera

0.4A

Vector Nav

0.25A

Science

??

We currently have 4x 5V smart switches rated for 2A each and 4x 5V outputs. The plan is to supply two outputs from one 5A buck and the other from another 5A buck. Does it make sense to have terminal for each device we expect to support? or splice it later? I guess it matter on where each device is located on the rover

Output Terminals

Load Switch

Buck

Devices

Output Terminals

Load Switch

Buck

Devices

J1

SW1

BUCK1

PI

J2

SW2

BUCK1

Zed2 Camera, Gimblal, Vector Nav

J3

SW3

BUCK2

Science Reserved

J4

SW4

BUCK2

Science Rserved

Device

Load

Device

Load

SW1

2A

SW2

~1A

SW3

RESERVED

SW4

RESERVED

BUCK1

3A

BUCK2

RESERVED

Design Questions:

  • How much power will each of the drives need? 2.5 A?

  • How much current with the science system draw? 5A enough?

  • How many 5V terminal do we want? Where will each of the 5V loads be located?

To-Do:

The temperature sensor footprint is missing