M4 Mechanical Tasks - URC 2025
Post SAR, competition critical tasks
Tasks (Links to full description) | Brief | Due Dates | Task Owner | Risk Management | Timeline | PDR Component |
---|---|---|---|---|---|---|
Autonomy camera mount | Rev 2 finalized design of autonomy camera mounts with consideration for overall system and robot package |
|
| Major | Unassigned | Yes PDR Completed |
Ebox Redesign | Revision of the electrical box to be a lot more designed for assembly and have a well detailed layout for all architecturally decided electrical components | Mar 31, 2025 |
| Critical | Unassigned | Yes PDR Completed |
LED Matrix | Led strip |
|
| Major | Unassigned | Yes PDR Completed |
End effector tools |
| @Adam Selalmatzidis | Major | On track | Yes PDR Completed | |
Ebox Front Panel |
| Feb 19, 2025 | @Alanna Rudolph | Major Sustaining | AT RISK | Yes PDR Completed |
Note: Tasks are currently high level and will be further split up