Rev 1 - F2020 to F2021 - Cindy Li/Chealsie Bains

TODO

  • Review AGX connector footprint
  • Make sure nets / ports match between sheets
  • Replace all components with our library components
  • Review components (check stock)
  • Make all resistors 0402
  • Connect inter-sheet signals on the high level sheet
  • Make caps 0402