Goals
- Welcome (more) new members!)
- Review status of the rover
- Review work delegation
...
Name | Program & Year | On-Campus? |
---|---|---|
Arlo | 1B Mechanical | Campus (2-3 weeks) |
Charmaine | 3A Mechanical | Campus |
David | 3A Mechatronics | Remote |
Kenneth | 1B Mechanical | Brampton |
Kyle | 2A Mechatronics | Campus (co-op) |
Olivia Y | 1B Mechatronics | Campus |
Demtool Feedback
- Consider the number of set-ups required to make a piece
- Make blind holes through if possible
- Ex. MR22-DT-P0116 (suspension)
- Give them the part, then they will account for machining modifications
- Ex. MR22-DT-P00027 is to be laser cut. We'll send them a step of the file with nominal holes, then they'll modify it to be cut undersized so that it can be reamed
- Want assembly drawings and assembly STEPs to understand the context of a piece!
- Can give some sort of note or way to inform them of non-critical features, i.e. clearance holes, unimportant radii
- Put in a note, or signify with drawing tolerance
...
Member | Update | Action Items |
---|---|---|
Emily Adam |
|
|
Austin Tailon Huang |
|
|
Max Apitz-Grossman |
|
|
Ethan Cronier |
|
|
Andrew Tersigni (Deactivated) |
|
|
Asha Mills Emmett | ||
Elizabeth Jung | ||
Olabisi Sanusi | ||
Chanpakorn Chaiklahan | ||
Medina Colabrese |
|
|
Jasmine Milan |
|
|
Abdul Haseeb | ||
Steven Gong |
|
|
Conall | ||
Ryan C. | ||
Simon | ||
Aiysha | ||
Ash | ||
Chris | ||
Gavin | ||
Joshua | ||
Matthew | ||
Olivia | ||
Ryan M. | ||
Zia |
...
- Gimbal assembly maintenance
- Person to talk to: Max
- Processing tensile test data (1B or higher)
- Fix/tune the printer (first level calibration, benchy testing, figure out how to get good prints. ideal for someone with low level familiarity of how a 3D printer works)
- 1 week timeline
- Drafting
- Assembly drawings!
- Machining!
- Let Emily know your availability this week
- Machine shop hours: 8:30am - 9pm M-F, 10am - 5pm Sat.
- Need to complete ESMS Safety training before we can get you started
- Course found on LEARN called “ESMS Safety Orientation”
- Let Emily know your availability this week
- ARM TASKS
- Need someone to own machining + assembly for A1, A2, A3, A4 (ideally 4 different people)
- This is an IN-PERSON task
- Familiarize yourself with assembly while stocks/boms are finished this week
- Camera Mounting Interface Design (Remote)
- Drawings for Axis 4 Parts:
- P0243
- P0244
- P0245
- P0246
- P0247
- P0248
- P0250
- P0251
- P0254
- Need someone to own machining + assembly for A1, A2, A3, A4 (ideally 4 different people)
Members who need edit Access for Confluence
- Charmaine Chun: c3chun@uwaterloo.ca
- Gavin Mesz: gmesz@uwaterloo.ca
- Conall Kingshott: ckingsho@uwaterloo.ca
- Simon Gorbet: sgorbet@uwaterloo.ca
- Kenneth Francis: k23franc@uwaterloo.ca
- Zia Formuly: azformul@uwaterloo.ca
- Ryan: r2mark@uwaterloo.ca
General Notes
- Old CF tube size: 32mm OD x 29mm ID
- New CF tube size: 1.257" (31.9278mm) OD x 1.125" (28.575mm) ID
- ID tol: +/-0.006"
- OD tol: +/-0.012"
- Need to update bonding pieces & template
...