Goals
- Welcome (more) new members!)
- Review status of the rover
- Review work delegation
New Member Introduction!
Name | Program & Year | On-Campus? |
---|
|
|
|
- Consider the number of set-ups required to make a piece
- Make blind holes through if possible
- Ex. MR22-DT-P0116 (suspension)
- Give them the part, then they will account for machining modifications
- Ex. MR22-DT-P00027 is to be laser cut. We'll send them a step of the file with nominal holes, then they'll modify it to be cut undersized so that it can be reamed
- Want assembly drawings and assembly STEPs to understand the context of a piece!
- Can give some sort of note or way to inform them of non-critical features, i.e. clearance holes, unimportant radii
- Put in a note, or signify with drawing tolerance
Update & Action Items
- If you're free to machine, state your availability for this week!
Member | Update | Action Items |
---|
Emily Adam | - Overall drivetrain updates...
- CF tube sourcing
- Comms stand relocation
- Battery relocation & mounting
- Bonding test status
- Bonding fixture discussion
- Coordinating machining
- Ordering...
- First round of EMS stock purchased for machining → more to be bought for tomorrow
- Putting together McMaster-Carr BOM
- Visited Demtool! Got feedback on how we can best prepare our parts to be machined by them
| - Tn → order EMS stock, assign machining
- Finish McMaster-Carr order
- Email Demtool with a priority list
- Agile manufacturing order
|
Austin Tailon Huang | - Overall arm updates
- Brian is open to CNC'ing P0060
- Main arm design complete
- Reached out to SKF; waiting for response
- Maxon motors arriving this week
| - Continue COTS tracker for SKF, Misumi McMaster, DFROBOT
- Select drill and angle grinder for weef funds
- Order stock for P0060 and figure out stock sizes for remaining parts
- A4 sensor mount
|
Max Apitz-Grossman | - Suspension bom done
- Drawings sent in drafting soon for approval/more feedback
| - Go through science and compile a list of stock to be sourced for the machining homies
- Get someone to handle gimbal
|
Ethan Cronier |
|
|
Andrew Tersigni (Deactivated) | - relocated comms/gimbal stand to back of chassis
| - make drawings for new chassis comms stand parts
- update chassis BOM
- update parts/drawings for new CF bonding diameter
- update part machining tracker for chassis
|
Asha Mills Emmett |
|
|
Elizabeth Jung |
|
|
Olabisi Sanusi |
|
|
Chanpakorn Chaiklahan |
|
|
Medina Colabrese |
|
|
Jasmine Milan |
|
|
Abdul Haseeb |
|
|
Steven Gong |
|
|
Conall |
|
|
Ryan C. |
|
|
Simon |
|
|
Aiysha |
|
|
Ash |
|
|
Chris |
|
|
Gavin |
|
|
Joshua |
|
|
Matthew |
|
|
Olivia |
|
|
Ryan M. |
|
|
Zia |
|
|
New Tasks
- Gimbal assembly maintenance
- Processing tensile test data (1B or higher)
- Fix/tune the printer (first level calibration, benchy testing, figure out how to get good prints. ideal for someone with low level familiarity of how a 3D printer works)
- Drafting
- Machining!
- Let Emily know your availability this week
- Machine shop hours: 8:30am - 9pm M-F, 10am - 5pm Sat.
- Need to complete ESMS Safety training before we can get you started
- Course found on LEARN called “ESMS Safety Orientation”
- ARM TASKS
- Need someone to own machining + assembly for A1, A2, A3, A4 (ideally 4 different people)
- This is an IN-PERSON task
- Familiarize yourself with assembly while stocks/boms are finished this week
- Camera Mounting Interface Design (Remote)
- Drawings for Axis 4 Parts:
- P0243
- P0244
- P0245
- P0246
- P0247
- P0248
- P0250
- P0251
- P0254
General Notes
- Old CF tube size: 32mm OD x 29mm ID
- New CF tube size: 1.257" (31.9278mm) OD x 1.125" (28.575mm) ID
- ID tol: +/-0.006"
- OD tol: +/-0.012"
- Need to update bonding pieces & template