Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Current »


General Announcements

  • First hybrid meeting!

  • Welcome to our first in person meeting!

  • Safety captain - Assigned to Allen!


Drivetrain - Updates

Drivetrain Integration

 Drivetrain Integration Notes

Champions

Updates

  • Built as much as possible over the weekend, full build was not finished

Blockers

  • Minor parts need to get remade on gimbal plate and chassis

  • Wheel connections need to be finished

Weekly Retrospect

Weekly Targets

  • Beginning of next week → assembly completed Emily Adam
  • Second build session (complete drivetrain)

Wheel Connection

 Wheel Connection Notes

Champions

Updates

  • Did test print of the hubs. The motor-gearbox assembly clears the edges of the hub, but is close

  • New motor mounting parts from demtool have arrived completed

Blockers

  • Need wheel hub prints to finish wheel connection

Weekly Retrospect

Weekly Targets

  • Finish printing wheel hub army: Ryan ChanMedina ColabreseOlivia Zheng (Use WatIMake, team printers, etc)
  • Finish motor mounting assembly Emily Adam
  • Modify and update the wheel hubs to accommodate new parts

Chassis

 Chassis Notes

Champions

Updates

  • Chassis has been built

Blockers

  • Waterjet plate on top of comms stand needs to get reworked and waterjet, current size is too large

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

Differential Bar

 Differential Bar Notes

Champions

Updates

  • Most of assembly finished this weekend

Blockers

  • P0028 needs to be redone on waterjet - hole pattern is not aligned properly with mating feature

Weekly Retrospect

Weekly Targets

  • Redo P0028 (QTY: 4) Emily Adam

  • Assemble fully on Saturday build session Emily Adam

Suspension

 Suspension Notes

Champions

Updates

  • Suspension assembly completed

Blockers

  • N/A

Weekly Retrospect

Weekly Targets

  • Create tracking page for build notes/observations (investigate why one side is more rigid than the other) Max Apitz-Grossman
  • Add spacer for messed up P0106 side → Emily Adam

Drivetrain - High Level Goals

Active Goals

  • Assemble full drivetrain
  • Finish printing all wheel connection parts
  • Finish machining all chassis parts
  • Finish machining all differential parts
  • Finish qty 6 wheel connection assy.
  • Finish differential bar assembly
 Completed Goals
  • Finish chassis assembly
  • Finish suspension assembly

Drivetrain - Known Issues

  • Fixing play issues with suspension

save for next meeting


Arm - Updates

Arm Integration

 Arm Integration Notes

Champions

Updates

  • OTS Fasteners, Misumi, Demtool, stock parts should all be in bay → everything ready to get things assembled

Blockers

  • Assigned members have been focusing on drivetrain assembly and midterms for the past week

Weekly Retrospect

Weekly Targets

Axis 1

 Axis 1 Notes

Champions

Updates

  • Talked to Austin and confirmed parts that need to machined and found Google spreadsheet with EMS shop orders

  • Planning to machine (drill holes) for two remaining parts this week

Blockers

Weekly Retrospect

(link previous weeks updates here)

  • Machined part MR22-A1-P0040 for the axis
  • Other weeks machined MR22-A1-P0037/38 and completed ESMS Training
  • Talk to Austin to see if two parts can be machined Austin Tailon HuangRyan Mark
  • Touch base with Austin to figure out what fasteners were replaced Austin Tailon HuangRyan Mark

Weekly Targets

Axis 2

 Axis 2 Notes

Champions

Updates

  • Elizabeth Jung is going from GTA to UW weekend of 18th → if nobody else is going earlier she will bring it

Blockers

  • Midterms prevented work on the past week

Weekly Retrospect

Weekly Targets

Axis 3

 Axis 3 Notes

Champions

Updates

  • Preparing for assembly

  • Received P0062 from Demtool

Blockers

  • Waterjet bounty for P0240 (Now Taken)

Weekly Retrospect

Weekly Targets

Axis 4

 Axis 4 Notes

Champions

Updates

Blockers

  • Waiting and 0246 (Christopher James Kenneweg (Deactivated)

  • Part 244 is in the bay

  • The last 2 parts are needed to finish assembly (will be started without)

  • Still have to check if OTS parts are ordered and in the bay (started doing Mar 8)

  • I (Gavin) has a couple things to do this week that will possibly slow down assembly (less time for school)

Weekly Retrospect

(link previous weeks updates here)

  • Start assembly - find someone to work on it while Gavin and Arlo have midterms Austin Tailon Huang !
  • Midterm week Gavin Mesz is tied up!
  • Figure out the status on 0244 Matthew Zhu

Weekly Targets

Axis 5/6

 Axis 5/6 Notes

Champions

Updates

  • Demtool parts arrived

  • Started machining parts

  • Most other parts ready to machine (will send bounties soon)

  • One more drawing to make

Blockers

  • Demtool part will take the longest probably - maybe CNC in house??

    • ESMS guys will do it for us next week

Weekly Retrospect

Weekly Targets

O-Drive Enclosures

 O-Drive Enclosure Notes

Champions

Updates

  • Review wrapped up - integrating feedback

Blockers

  • No blockers

Weekly Retrospect

Weekly Targets

  • Integrate feedback from design review Thomas Valer

IntegArm - High Level Goals

Active Goals

  • Assemble full arm
  • Finish fabricating all parts for Axis 1
  • Finish fabricating all parts for Axis 2
  • Finish fabricating all parts for Axis 3
  • Finish fabricating all parts for Axis 4
  • Finish fabricating all parts for Axis 5/6
  • Assemble Axis 1
  • Assemble Axis 2
  • Assemble Axis 3
  • Assemble Axis 4
  • Assemble Axis 5/6
  • Finish O-Drive enclosure design
  • Fabricate O-Drive enclosures
 Completed Goals
  • Move completed goals here

Arm Known Issues


Science Updates

Science Integration

 Science Integration Notes

Champions

Updates

  • Time to start working on science!

  • First step: assembly drawings

Blockers

  • Fastener ordering, including some the ems store doesn’t carry

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • assembly drawings done by end of week
  • all ems fasteners ordered, going to hold back on mcmaster/other sources for the niche bolts until we have more to order

Drill Bit Module

 Drill Bit Module Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Dirt Read Head Module

 Dirt Read Head Module Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Elevator Modules

 Elevator Module Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Test Tube Module

 Test Tube Module Notes

Champions

  • TBD

Updates

  • Still need to fix dirt delivery nozzles based on new dimensions of test tubes (also need to find all of the test tubes in the bay) Gavin Mesz

    • nozzles need 3D print prototypes to test fit new o-ring

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Base Frame

 Base Frame Notes

Champions

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

Science - High Level Goals

Active Goals

  • Assemble full science mechanism
  • Finish fabricating all parts for drill bit module
  • Finish fabricating all parts for dirt read head module
  • Finish fabricating all parts for elevator modules
  • Finish fabricating all parts for test tube module
  • Finish fabricating all parts for base frame
  • Assemble drill bit module
  • Assemble dirt read head module
  • Assemble elevator modules
  • Assemble test tube module
  • Assemble base frame
 Completed Goals
  • Move completed goals here

Science - Known Issues


Electrical Box - Updates

 Electrical Box Notes

Champions

Updates

  • Ebox mounts are ready for review and printing - just need to confirm placement in CAD and review model

  • New task - ebox layout! Austin Tailon Huang for more details

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

Electrical Box - High Level Goals

Active Goals

  • Assemble electrical box on new chassis
  • Determine level of rework for electrical box
  • Verify fully enclosed mass
 Completed Goals
  • Move completed goals here


End Effector - Updates

 Gimbal Notes

Champions

  • @zia formuly

Updates

  • Misumi parts incoming have arrived

Blockers

  • No current blockers

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

  • Assemble the gripper @zia formuly

End Effector - High Level Goals

Active Goals

  • Assemble end effector
 Completed Goals
  • Move completed goals here


Gimbal/Vision - Updates

 Gimbal Notes

Champions

Updates

  • Gimbal is in bay

Blockers

  • Midterms 😞

Weekly Retrospect

  •  

Weekly Targets

Wrist Camera

 Wrist Camera Notes

Champions

Updates

  • Wrist mount camera design is finalized!

  • Any other updates (wink)

Blockers

  • Insert blockers here

Weekly Retrospect

  •  

Weekly Targets

Gimbal/Vision - High Level Goals

Active Goals

  • Rework gimbal parts
  • Assemble reworked gimbal
  • Finish wrist camera mount design
  • Fabricate wrist camera
 Completed Goals
  • Move completed goals here


LED Matrix - Updates

 LED Matrix Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Assess state of current LED matrix (put owner)
  • Determine any necessary reworks to install on current rover (put owner)

LED Matrix - High Level Goals

Active Goals

  • Rework old LED matrix
  • Install LED matrix on new rover
 Completed Goals
  • Move completed goals here


Battery Mount - Updates

 Battery Mount Notes

Champions

Updates

  • Design finalized - ready to machine

Blockers

  • Insert blockers here

Weekly Retrospect

  •  

Weekly Targets

Battery Mount - High Level Goals

Active Goals

  • Finalize design of new battery mount
  • Fabricate battery mount
  • Install battery mount on new rover
 Completed Goals
  • Move completed goals here


E-Stop - Updates

 E-Stop Notes

Champions

Updates

  • Cad is done

  • 3D printed

Blockers

  • I ordered the wrong bolts from EMS

Weekly Retrospect

  •  

Weekly Targets

  • get bolts

E-Stop - High Level Goals

Active Goals

  • Install E-stop on rover
 Completed Goals
  • Move completed goals here


Comms - Updates

 Comms Tower (Rover)

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.
 Base Station

Champions

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Comms - High Level Goals

Active Goals

  • Verify capabilities of comms station
  • Determine if antennae position rework is necessary
 Completed Goals
  • Move completed goals here


Other Updates/New Tasks

  • This section is free form. Please feel free to add any other updates you would like.

ROLE ASSIGNING:

Safety captain → Allen has secured the bag

Science →

LED Matrix →

Comms →

  • No labels