Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


General Announcements

  • New meeting minute template!

    • Easier to track progress on active projects / know who's working on what

    • Please add your name/updates to the project categories you are working on

    • Anything that does not fall within this umbrella can be listed in “Member Updates”

  • Austin is no longer mech lead → now doing PM work

  • CoLab - any interest? https://www.youtube.com/watch?v=yh5pNk5poVw

  • Add the following people to confluence Emily Adam

    • Chris Kenneweg

    • Zia Formuly

    • Taim Al-Dabbagh

  • Hybrid meetings to start next week! Keep posted in the mech channel for a message from Emily to hear whats going on :))


Drivetrain - Updates

Drivetrain Integration

Expand
titleDrivetrain Integration Notes

Champions

Updates

  • Finished majority of chassis and suspension assembly

    • Slightly disassembled at the moment (wheel connections)

  • Full drivetrain/chassis CAD up to date.

  • ETA: Done by end of next week (March 11th)

Blockers

  • Motor mount brackets from Demtool → arriving Friday!

  • Wheel hub prints → verification print, then fleet print at WatiMake

Weekly Retrospect

  •  N/A

Weekly Targets

  •  Build session at 12pm. Intended to build full DT minus the wheel hubs (smile) ? Emily Adam(If you plan to attend the session, please @ yourself here!) Max Apitz-Grossman

Wheel Connection

Expand
titleWheel Connection Notes

Champions

Updates

  • Sent updated MR22-DT-P0106 to Demtool to be machined

  • Drilled and tapped the new VP motor shafts to be swapped out with the current ones

  • Any other important updates (wink)

Blockers

  • MR22-DT-P0106 being machined by Demtool → arrive this Friday!

Weekly Retrospect

  •  N/A

Weekly Targets

Chassis

Expand
titleChassis Notes

Champions

Updates

  • Finished assembly! Minus comms stand plate

Blockers

  • Modifications to MR22-DT-P0092

Weekly Retrospect

(link previous weeks updates here)

  •  Finish modifications to P0092 and potentially P0090 → Emily Adam
  •  Get P0096 cut on the waterjet → Emily Adam

Weekly Targets

Differential Bar

Expand
titleDifferential Bar Notes

Champions

Updates

  • Fasteners have been ordered!

  • Only MR22-DT-P0035 left to machine

Blockers

  • Hex stock shipped to the EMS store? Probably

Weekly Retrospect

  •  N/A

Weekly Targets

  •  Have fully assembled Emily Adam
  •  Pick up purchased stock for MR22-DT-P0035 → Emily Adam
  •  Machine MR22-DT-P0035 → Emily Adam

Suspension

Expand
titleSuspension Notes

Champions

Updates

  • Squeaky clean CAD

  • Mostly fully assembled

  • SKF bearings came in! Pressed into P0116, has yet to be reassembled

Blockers

  • Retaining rings for chassis integration to be ordered from McMaster-Carr?

Weekly Retrospect

  •  N/A

Weekly Targets

Drivetrain - High Level Goals

Active Goals

  •  Assemble full drivetrain
  •  Finish printing all wheel connection parts
  •  Finish machining all chassis parts
  •  Finish machining all differential parts
  •  Finish qty 6 wheel connection assy.
  •  Finish chassis assembly
  •  Finish suspension assembly
  •  Finish differential bar assembly
Expand
titleCompleted Goals
  • Move completed goals here when they are done.


Arm - Updates

Arm Integration

Expand
titleArm Integration Notes

Champions

Updates

  • No major updates

Blockers

  • Insert blockers here

Weekly Retrospect

  •  

Weekly Targets

Axis 1

Expand
titleAxis 1 Notes

Champions

Updates

  • Parts needed for assembly found and organized in blue “Axis 1” box (lots of parts for this axis - see combined pdf below!)

  • Missing some parts (see Blockers) so can’t do full build; will be able to do full assembly once all parts are found

Blockers

Weekly Retrospect

(link previous weeks updates here)

  •  Machined part MR22-A1-P0040 for the axis (thought it was only part missing but it’s not:()
  •  Other weeks machined MR22-A1-P0037/38 and completed ESMS Training

Weekly Targets

Axis 2

Expand
titleAxis 2 Notes

Champions

Updates

  • Strainwave gearbox is in Thornhill, Ontario → can someone bring it to UW?

  • Assembly status

  • Is part tracker fully up to date?

  • Any other important updates (wink)

Blockers

  • Strainwave gearbox

Weekly Retrospect

  •  

Weekly Targets

Axis 3

Expand
titleAxis 3 Notes

Champions

Updates

  • Part Tracker is up to date

  • Worked on A3 Assembly Drawing

  • @Zia Formuly is Machining P0061

Blockers

  • Part 0062 is sponsor machined - currently sent to Demtool (should arrive by

  • waterjet bounty for P0240 (Pressure Washer last part for machining)

  • P0061 Stock is 3mm short lengthwise

Weekly Retrospect

  • @Chris Kenneweg Completed P0077, P0241, P0252 → parts currently in bay

Weekly Targets

Axis 4

Expand
titleAxis 4 Notes

Champions

Updates

  • No major updates for the time being

  • Part track is fully up to date

  • Any other important updates (wink)

    • Still Waiting on 244 (Matthew Zhu) and 246 (Kyle Ferrier)

    • All other parts finished machining

Blockers

  • Waiting on part 0244 (Matthew Zhu ) and 0246 (Kyle Ferrier )

  • The last 2 parts are needed to finish assembly (will be started without)

  • Still have to check if OTS parts are ordered and in the bay

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Midterm week Gavin Mesz is tied up!
  •  Figure out the status on 0244 Matthew Zhu
  •  Finish up part 0246 Kyle Ferrier
  •  Check to see if we have all required OTS parts ordered and in the bay Austin Tailon Huang
  •  Start assembly - find someone to work on it while Gavin and Arlo have midterms Austin Tailon Huang !

Axis 5/6

Expand
titleAxis 5/6 Notes

Champions

Updates

  • Parts sent to Demtool, arriving by

  • Started machining parts

  • Most other parts ready to machine (will send bounties soon)

  • One more drawing to make

Blockers

  • Demtool part will take the longest probably - maybe CNC in house??

Weekly Retrospect

  •  

Weekly Targets

  •  Make P0080 drawing Charmaine Chun
  •  Determine if we can machine CNC’d parts in house Medina Colabrese
  •  Machine some stuff → add specifics as bounties are posted
  •  Order boxtube Medina Colabrese

O-Drive Enclosures

Expand
titleO-Drive Enclosure Notes

Champions

Updates

  • Ready for review! Double checking hardware specs

Blockers

  • No blockers

Weekly Retrospect

  •  

Weekly Targets

Arm - High Level Goals

Active Goals

  •  Assemble full arm
  •  Finish fabricating all parts for Axis 1
  •  Finish fabricating all parts for Axis 2
  •  Finish fabricating all parts for Axis 3
  •  Finish fabricating all parts for Axis 4
  •  Finish fabricating all parts for Axis 5/6
  •  Assemble Axis 1
  •  Assemble Axis 2
  •  Assemble Axis 3
  •  Assemble Axis 4
  •  Assemble Axis 5/6
  •  Finish O-Drive enclosure design
  •  Fabricate O-Drive enclosures
Expand
titleCompleted Goals
  • Move completed goals here


Science Updates

Science Integration

Expand
titleScience Integration Notes

Champions

Updates

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.

Drill Bit Module

Expand
titleDrill Bit Module Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.

Dirt Read Head Module

Expand
titleDirt Read Head Module Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.

Elevator Modules

Expand
titleElevator Module Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.

Test Tube Module

Expand
titleTest Tube Module Notes

Champions

  • TBD

Updates

  • Still need to fix dirt delivery nozzles based on new dimensions of test tubes (also need to find all of the test tubes in the bay) Gavin Mesz

    • nozzles need 3D print prototypes to test fit new o-ring

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.

Base Frame

Expand
titleBase Frame Notes

Champions

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

Science - High Level Goals

Active Goals

  •  Assemble full science mechanism
  •  Finish fabricating all parts for drill bit module
  •  Finish fabricating all parts for dirt read head module
  •  Finish fabricating all parts for elevator modules
  •  Finish fabricating all parts for test tube module
  •  Finish fabricating all parts for base frame
  •  Assemble drill bit module
  •  Assemble dirt read head module
  •  Assemble elevator modules
  •  Assemble test tube module
  •  Assemble base frame
Expand
titleCompleted Goals
  • Move completed goals here


Electrical Box - Updates

Expand
titleElectrical Box Notes

Champions

Updates

  • Ebox mounts are ready for review and printing - just need to confirm placement in CAD and review model

  • New task - ebox layout! Austin Tailon Huang for more details

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

Electrical Box - High Level Goals

Active Goals

  •  Assemble electrical box on new chassis
  •  Determine level of rework for electrical box
  •  Verify fully enclosed mass
Expand
titleCompleted Goals
  • Move completed goals here


End Effector - Updates

Expand
titleGimbal Notes

Champions

  • @zia formuly

Updates

  • Misumi parts incoming - stay posted!

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Determine estimated arrival date of Misumi parts Austin Tailon Huang
  •  Determine current state of gripper, figure out what needs to get done Austin Tailon Huang
  •  Do the gripper @zia formuly

End Effector - High Level Goals

Active Goals

  •  Assemble end effector
Expand
titleCompleted Goals
  • Move completed goals here


Gimbal/Vision - Updates

Expand
titleGimbal Notes

Champions

Updates

  • Gimbal is in bay

Blockers

  • Midterms 😞

Weekly Retrospect

  •  

Weekly Targets

Wrist Camera

Expand
titleWrist Camera Notes

Champions

Updates

  • Wrist mount camera design is finalized!

  • Any other updates(wink)

Blockers

  • Insert blockers here

Weekly Retrospect

  •  

Weekly Targets

Gimbal/Vision - High Level Goals

Active Goals

  •  Rework gimbal parts
  •  Assemble reworked gimbal
  •  Finish wrist camera mount design
  •  Fabricate wrist camera
Expand
titleCompleted Goals
  • Move completed goals here


LED Matrix - Updates

Expand
titleLED Matrix Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Assess state of current LED matrix (put owner)
  •  Determine any necessary reworks to install on current rover (put owner)

LED Matrix - High Level Goals

Active Goals

  •  Rework old LED matrix
  •  Install LED matrix on new rover
Expand
titleCompleted Goals
  • Move completed goals here


Battery Mount - Updates

Expand
titleBattery Mount Notes

Champions

Updates

  • Design finalized - ready to machine

Blockers

  • Insert blockers here

Weekly Retrospect

  •  

Weekly Targets

Battery Mount - High Level Goals

Active Goals

  •  Finalize design of new battery mount
  •  Fabricate battery mount
  •  Install battery mount on new rover
Expand
titleCompleted Goals
  • Move completed goals here


E-Stop - Updates

Expand
titleE-Stop Notes

Champions

Updates

  • Need to figure out how to mount the E-stop on our new chassis

Blockers

  • Insert blockers here

Weekly Retrospect

  •  

Weekly Targets

E-Stop - High Level Goals

Active Goals

  •  Install E-stop on rover
Expand
titleCompleted Goals
  • Move completed goals here


Comms - Updates

Expand
titleComms Tower (Rover)

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.
Expand
titleBase Station

Champions

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.

Comms - High Level Goals

Active Goals

  •  Verify capabilities of comms station
  •  Determine if antennae position rework is necessary
Expand
titleCompleted Goals
  • Move completed goals here


Other Updates

  • This section is free form. Please feel free to add any other updates you would like.

  • Max Apitz-Grossman : Mars Lander?

    • concept completed, CAD mostly completed

    • Find absolute cheapest material lol

  • @connor starting the training

  • SAR