Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Current »

Overview:

The drivetrain system is critical to the URC 2025 competition requirement. It enables the rover to move inside the desert and carry the equipment to a specific location required by the competition. The system will also be directly interlinked through IPC with the autonomy system to provide middleware for autonomy to control the rover and focus more on high-level intelligent planning.

Requirements:

  • Six motor and wheel turning
  • rocker-boogie suspension
  • Provide a chassis to install the rest of the system on top of the drivetrain
  • power through a 48v battery
  • user joystick input
  • Autonomy abstract command input
  • User control mode
    • Direct joystick mapping (worst-case fallback mode)
    • speed input controlling
    • GPS position input controlling
  • arcade controller (gives the user more control flexibility)
  • soft-start/ speed ramping(improve current draining performance)
  • CAN communication
  • Close loop control
  • Global positioning estimate(GPS) and local positioning estimate(encoder)
  • System re-sync and recalibration(if required) [Estop Triggered]


Note: The drivetrain feedback loop differs from the motor driver's built-in control loop. It fuses the global and local positioning systems to compensate for the effect of the desert environment or terrain.


Constraint:

  • Limited mechanical attention will be on this system
  • Need to return the 4 spark flex currently used in the system


Nice to have:

  • The right side of the drivetrain chassis reassembly
  • wheel remanufacture
  • driver beyond visual line of sight rover behaviour sensing
  • support specific tuning on each of the wheel independently
  • thermal monitoring


Interface:

  • Interface with communication system
    • User input
    • System status dump to GUI
  • Interface with Autonomy
    • System control input

Design validation decussion

  • insert the meeting minutes for all the discussion

Architecture:

Mechanical Design of the current drivetrain system

URC 2025 competition Drivetrain:


Insert a software sequence diagram:


Timeline(need to discuss with Alex Szabo

  • define major milestone(decouple all the parts)
  • three stage
    • design
    • MVP
    • cleanup
  • Demonstration date
  • Link to subteam tasks lists and assignee document

Risk mitigation

SubtasksStatusImpact evaluationalternative solutionMax allowance time

DANGER

??? the impact have not been understood

ON TRACK

HIGH will affect multiple system functionality

MEDIUM will affect one or two low-priority system

LOW does not affect the rest of the system

  • plan A
    • advantage:
    • disadvantage:
    • cost
    • Required time:







Inventory

Item NameStatusCostreferencing document
Insert the product name here

PLANNING

ORDERED

TESTED

INSTALLED

$
  • datasheet
  • user manual





Update & Action Items

MemberUpdateAction Items




New Tasks

General Notes

Project ownership(person to contact)

Name of the person (Onsite/ Remote)

  • No labels