Weekly Updates

Member

Main Project

Status

Update

Action Items

Ari Wasch

BMS

David Choi

DD Current Sense / Comms

✅🚹

Any update on the DD Current Sense part selection? Any update on Comms?

Logan Hartford

Lead

  • Made draft of the of the new onbarding procedure/presentation

  • Brainstormed some board ideas

Rayaan

5V OTS Buck

Any update on getting started with the DD current sense board?

Rishith Bomman

PDB

✅🚹

Any updates on PDB Rev 4.1?

Wolfgang Windholtz (Deactivated)

Science / Support

Yuchen Lin

DD Current Sense / Comms

Any update on the DD Current Sense part selection? Any update on Comms?

Priority I Tasks:

Task

Discussion Questions

Answers

Assigned To

  • Get the bare minimum electrical systems working for the drive train to be able to move
  • What is the bare minimum electrical system?

  • What are all the all the ways we can achieve this?

  • New requirements--Need to power:

    • Jetson - 17V, 10W-30W

    • Gimbal

      • Search up nominal voltage and current draw for gimbal motor

      • Zed2: 380mA @5V

    • Vector Nav - 5V, 250 mA

    • Anenna - 24V 1.5A

    • Pi - 5V 3A

    • What are the power requirements for each of these?

  • Encoders need 5V, mostly a current ref

    • 20mA per encoder

    • 48-5V buck

  • 48V to each motor

  • Apparently the Odrive supplies 5V to the encoders so no need for a buck

Total SAR Power Requirments

  • 17V - 4A
  • 5V - 380 + 250 + 3A => 4A
  • 24V - 1.5A

Rayaan

  • Validate the OTS BMS
  • How can this be done?

  • How easy of a project is this?

  • 3/5 tough

  • Use resistors divider board to validate basic functions

    • For checking over-voltage?

    • Hook up the cells to the BMS and test basic functions

  • Someone has definitely done battery emulation before

    • google it

Farris Matar (starting next week)

  • Create a SOP document for how to charge the LiPo battery pack
  • With vs without the BMS

  • What is the safest way?

  • What is the most convenient way?

  • Any concerns?

  • Should always charge it using a battery charger

  • Have the BMS hooked up as well

  • Connector solution

  • Put safety warnings, storage instructions etc

Yuchen Lin

  • Complete Rev 4.1 of PDB
  • Do we have time for a work session this weekend?

  • Yes

Rishith

  • Validate the electrical functionality of the LED matrix
  • What exactly does this consist of?

  • What needs to be done to verify?

  • Send a digital signal to the neopixels, bitshifts

  • Just need to hit it with PWM to set the colour of the whole thing

    • arduino town

David Choi / Rishith

/ Farris Matar

  • Set up 2.4 Ghz bands

  • working on instability issue

    • Should be fine with one antena

David Choi

Priority II/III Tasks:

Task

Priority

Status

Comments

  • Wire up the ARM

II

Waiting on mechanical/firmware

  • Wire the drivetrain

II

Waiting on mechanical/firmware

  • Set up 5 Ghz bands

III

Working on priority I comms first

  • Set up 900 Mhz bands

II

Working on priority I comms first

Active Projects:

Project

Currently Assigned To

Ticket

Due Date

Comments

Priority Level

PDB

Rishith Bomman /

Farris Matar / Rayaan

PDB Rev4 - Design and Assemble the PDB

  • Performance testing complete

  • Some small schematic and footprint issues across the board

  • 17V performed well except on start up

  • 5V is very noisey

HIGH

BMS

Joshua Harper / Ari Wasch / Olivia

BMS - Design and Assemble the BMS

  • One BMS has been assembled

  • Basic non-performacne and non-firmware tests have been done

  • An off the shelf replacement is being sourced

HIGH

Comms

Yuchen Lin / Logan Hartford

Comms

HIGH

Science

Science - Assemble & Test

MEDIUM

SPI LVDS

Farris Matar

SPI LVDS - Assemble and Test

  • SPI LVDS Host boards should have been assembled

  • SPI LVDS Peripheral parts and boards should be in the bay now, pending assembly

  • Harnesses need to be ordered in order to wire them up together and do testing

MEDIUM

RS422

David Choi / Farris Matar

RS422 - Assemble and Test

  • Farris Matar verified the design and was able to send data using the boards

  • 3 Boards have been assembled and tested

MEDIUM

LED Matrix

LED Matrix 2022/23

  • LED matrix has been located

  • Should work, just needs power and a PWM signal

MEDIUM

Digital Display Current Sense Board

Olivia Markham (Deactivated) / David Choi / Yuchen Lin

Current Sense Display

  • Currently in the schematic design phase of the project

LOW

  • No labels