- Created by Austin Tailon Huang, last modified on Mar 02, 2022
You are viewing an old version of this page. View the current version.
Compare with Current View Page History
« Previous Version 29 Next »
Meeting Participants | ||
---|---|---|
@chris kenneweg | ||
@taim al-dabbagh | @zia formuly |
General Announcements
New meeting minute template!
Easier to track progress on active projects / know who's working on what
Please add your name/updates to the project categories you are working on
Anything that does not fall within this umbrella can be listed in “Member Updates”
Austin is no longer mech lead → now doing PM work
CoLab - any interest? https://www.youtube.com/watch?v=yh5pNk5poVw
Add the following people to confluence Emily Adam
Chris Kenneweg
Zia Formuly
Taim Al-Dabbagh
Hybrid meetings to start next week! Keep posted in the mech channel for a message from Emily to hear whats going on :))
Drivetrain - Updates
Drivetrain Integration
Champions
Updates
Finished majority of chassis and suspension assembly
Slightly disassembled at the moment
Full drivetrain CAD up to date. Wheel hubs still being edited
ETA: Done by end of next week (March 11th)
Any other important updates
Blockers
Motor mount brackets from Demtool → arriving Friday!
Wheel hub prints → verification print, then fleet print
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Build session this Saturday, start 12pm?
Wheel Connection
Champions
Updates
Sent updated MR22-DT-P0106 to Demtool to be machined
Drilled and tapped the new VP motor shafts to be swapped out with the current ones
Any other important updates
Blockers
MR22-DT-P0106 being machined by Demtool → arrive this Friday!
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Clean up CAD of wheel hubs → Asha Mills Emmett
- Do a verification print (in PETG) of the wheel hub set → Asha Mills Emmett
- Print remaining wheel hubs → Emily Adam
- Assemble everything minus integration into the wheel hubs by end of Saturday
- Bare minimum: finish motor and gearbox assembly for FW to test with
Chassis
Champions
Updates
Finished assembly! Minus comms stand plate
Status of layout (E-box, battery mount, E-stop, gimbal position on chassis)
Any other important updates
Blockers
Modifications to MR22-DT-P0092
Weekly Retrospect
(link previous weeks updates here)
- Finish modifications to P0092 and potentially P0090 → Chanpakorn Chaiklahan ?
- Get P0096 cut on the waterjet → Emily Adam
Weekly Targets
- Have all parts ready for Saturday build session?
Differential Bar
Champions
Updates
Fasteners have been ordered!
Only MR22-DT-P0035 left to machine
Blockers
Hex stock shipped to the EMS store? Probably
Weekly Retrospect
(link previous weeks updates here)
- Pick up purchased stock for MR22-DT-P0035 → Emily Adam
- Machine MR22-DT-P0035 → Emily Adam
- Assembly!
Weekly Targets
- Have fully assembled for Saturday
Suspension
Champions
Updates
Mostly fully assembled
SKF bearings came in! Pressed into P0116, has yet to be reassembled
Any other important updates
Blockers
Retaining rings for
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Finish assembly by Ssaturday
Drivetrain - High Level Goals
Active Goals
- Assemble full drivetrain
- Finish machining all wheel connection parts
- Finish machining all chassis parts
- Finish machining all differential parts
- Finish qty 6 wheel connection assy.
- Finish chassis assembly
- Finish differential bar assembly
Move completed goals here when they are done.
Arm - Updates
Arm Integration
Champions
Updates
Insert Updates
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Axis 1
Champions
Ryan Mark //may attend meeting at 8:45 pm or not:( see updates below
Updates
Parts needed for assembly found and organized in blue “Axis 1” box (lots of parts for this axis - see combined pdf below!)
Missing some parts (see Blockers) so can’t do full build; will be able to do full assembly once all parts are found
Blockers
Missing parts and not sure if they are supposed to be ordered or if in regular bin
Some parts, such as sensors and bearings not sure where to find (is there a box for them similar to the McMaster Carr box)
Two parts that need to be machined but need parts; 1 part 3D print - only 1 was printed but 2 are needed (MR-22-A1-P0047)
https://docs.google.com/spreadsheets/d/1GX8MRuEKjcMgeYGpeaWunhaKGi090fbQMPo12oeaMmM/edit?usp=sharing
Axis Assembly PDF for all parts and assembly (spreadsheet above refers to pages - go here to see reference): https://drive.google.com/file/d/1yOD8Pa0HTJMYg8uZhkn1ByhAcDFBRbQB/view?usp=sharing
Weekly Retrospect
(link previous weeks updates here)
- Machined part MR22-A1-P0040 for the axis (thought it was only part missing but it’s not:()
- Other weeks machined MR22-A1-P0037/38 and completed ESMS Training
Weekly Targets
- Talk to Ethan to see if two parts can be machined
- Talk to Emily to see if parts are here or need to be re-ordered. Also, find where everything is
Axis 2
Champions
Updates
Strainwave gearbox is in Thornhill, Ontario → can someone bring it to UW?
Assembly status
Is part tracker fully up to date?
Any other important updates
Blockers
Strainwave gearbox
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Axis 3
Champions
Updates
@Zia Formuly is Machining P0061 (The stock is 3mm short)
Worked on A3 Assembly Drawing
Creating waterjet bounty for P0240 (Pressure Washer)
Blockers
Part 0062 is sponsor machined - currently sent to Demtool
Weekly Retrospect
Weekly Targets
- Complete Machining
- Begin Assembly
Axis 4
Champions
Updates
Assembly status
Nothing assembled yet
Is part tracker fully up to date?
Yep
Any other important updates
Still Waiting on 244 (Matthew Zhu) and 246 (Kyle Ferrier)
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Axis 5/6
Champions
Updates
Parts sent to Demtool (they said the CNCed part would take “some time”)
Started machining parts
Most other parts ready to machine (will send bounties soon)
One more drawing to make
Blockers
Waiting for Demtool parts
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
O-Drive Enclosures
Champions
Updates
Is design for enclosures ready for review? → ready for an informal design review?
Is layout / location finalized?
Any other important updates
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Arm - High Level Goals
Active Goals
- Assemble full arm
- Finish fabricating all parts for Axis 1
- Finish fabricating all parts for Axis 2
- Finish fabricating all parts for Axis 3
- Finish fabricating all parts for Axis 4
- Finish fabricating all parts for Axis 5/6
- Assemble Axis 1
- Assemble Axis 2
- Assemble Axis 3
- Assemble Axis 4
- Assemble Axis 5/6
- Finish O-Drive enclosure design
- Fabricate O-Drive enclosures
Move completed goals here
Science Updates
Science Integration
Champions
Updates
Time to start working on science!
Can we assign people to work on these sub-modules?
Austin Tailon Huang / Max Apitz-Grossman - meet up for science debrief?
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Drill Bit Module
Champions
TBD
Updates
Insert updates here
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Dirt Read Head Module
Champions
TBD
Updates
Insert updates here
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Elevator Modules
Champions
TBD
Updates
Insert updates here
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Test Tube Module
Champions
TBD
Updates
Still need to fix dirt delivery nozzles based on new dimensions of test tubes (also need to find all of the test tubes in the bay) - Gavin
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Base Frame
Champions
Updates
Insert updates here
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Create drawings for all t-slot extrusion sub-assemblies Austin Tailon Huang
Science - High Level Goals
Active Goals
- Assemble full science mechanism
- Finish fabricating all parts for drill bit module
- Finish fabricating all parts for dirt read head module
- Finish fabricating all parts for elevator modules
- Finish fabricating all parts for test tube module
- Finish fabricating all parts for base frame
- Assemble drill bit module
- Assemble dirt read head module
- Assemble elevator modules
- Assemble test tube module
- Assemble base frame
Move completed goals here
Electrical Box - Updates
Champions
@Zia Formuly Thomas Valer
Updates
Ebox mounts - design finalized and printed?
New task - ebox layout! Austin Tailon Huang for more details
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Electrical Box - High Level Goals
Active Goals
- Assemble electrical box on new chassis
- Determine level of rework for electrical box
- Verify fully enclosed mass
Move completed goals here
End Effector - Updates
Champions
TBD
Updates
Misumi parts incoming - stay posted!
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Determine estimated arrival date of Misumi parts Austin Tailon Huang
End Effector - High Level Goals
Active Goals
- Assemble end effector
Move completed goals here
Gimbal/Vision - Updates
Champions
Updates
Gimbal is in bay
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Wrist Camera
Champions
Updates
Wrist mount camera design finalized?
Has camera in bay been located / do you need help finding it?
Any other updates
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Gimbal/Vision - High Level Goals
Active Goals
- Rework gimbal parts
- Assemble reworked gimbal
- Finish wrist camera mount design
- Fabricate wrist camera
Move completed goals here
LED Matrix - Updates
Champions
TBD
Updates
Insert updates here
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Assess state of current LED matrix (put owner)
- Determine any necessary reworks to install on current rover (put owner)
LED Matrix - High Level Goals
Active Goals
- Rework old LED matrix
- Install LED matrix on new rover
Move completed goals here
Battery Mount - Updates
Champions
Updates
Design finalized / ready for review?
Drawing status?
Stock sizes determined?
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Battery Mount - High Level Goals
Active Goals
- Finalize design of new battery mount
- Fabricate battery mount
- Install battery mount on new rover
Move completed goals here
E-Stop - Updates
Champions
TBD
Updates
Insert updates here
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
E-Stop - High Level Goals
Active Goals
- Install E-stop on rover
Move completed goals here
Comms - Updates
Champions
TBD
Updates
Insert updates here
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Champions
Updates
Insert updates here
Blockers
Insert blockers here
Weekly Retrospect
(link previous weeks updates here)
Weekly Targets
- Insert progression target for the week, with owner.
Comms - High Level Goals
Active Goals
- Verify capabilities of comms station
- Determine if antennae position rework is necessary
Move completed goals here
Other Updates
This section is free form. Please feel free to add any other updates you would like.
Max Apitz-Grossman : Mars Lander?
- No labels