Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 29 Next »


General Announcements

  • New meeting minute template!

    • Easier to track progress on active projects / know who's working on what

    • Please add your name/updates to the project categories you are working on

    • Anything that does not fall within this umbrella can be listed in “Member Updates”

  • Austin is no longer mech lead → now doing PM work

  • CoLab - any interest? https://www.youtube.com/watch?v=yh5pNk5poVw

  • Add the following people to confluence Emily Adam

    • Chris Kenneweg

    • Zia Formuly

    • Taim Al-Dabbagh

  • Hybrid meetings to start next week! Keep posted in the mech channel for a message from Emily to hear whats going on :))


Drivetrain - Updates

Drivetrain Integration

 Drivetrain Integration Notes

Champions

Updates

  • Finished majority of chassis and suspension assembly

    • Slightly disassembled at the moment

  • Full drivetrain CAD up to date. Wheel hubs still being edited

  • ETA: Done by end of next week (March 11th)

  • Any other important updates (wink)

Blockers

  • Motor mount brackets from Demtool → arriving Friday!

  • Wheel hub prints → verification print, then fleet print

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Build session this Saturday, start 12pm?

Wheel Connection

 Wheel Connection Notes

Champions

Updates

  • Sent updated MR22-DT-P0106 to Demtool to be machined

  • Drilled and tapped the new VP motor shafts to be swapped out with the current ones

  • Any other important updates (wink)

Blockers

  • MR22-DT-P0106 being machined by Demtool → arrive this Friday!

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

  • Clean up CAD of wheel hubs → Asha Mills Emmett
  • Do a verification print (in PETG) of the wheel hub set → Asha Mills Emmett
  • Print remaining wheel hubs → Emily Adam
  • Assemble everything minus integration into the wheel hubs by end of Saturday
    • Bare minimum: finish motor and gearbox assembly for FW to test with

Chassis

 Chassis Notes

Champions

Updates

  • Finished assembly! Minus comms stand plate

  • Status of layout (E-box, battery mount, E-stop, gimbal position on chassis)

  • Any other important updates (wink)

Blockers

  • Modifications to MR22-DT-P0092

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

  • Have all parts ready for Saturday build session?

Differential Bar

 Differential Bar Notes

Champions

Updates

  • Fasteners have been ordered!

  • Only MR22-DT-P0035 left to machine

Blockers

  • Hex stock shipped to the EMS store? Probably

Weekly Retrospect

(link previous weeks updates here)

  • Pick up purchased stock for MR22-DT-P0035 → Emily Adam
  • Machine MR22-DT-P0035 → Emily Adam
  • Assembly!

Weekly Targets

  • Have fully assembled for Saturday

Suspension

 Suspension Notes

Champions

Updates

  • Mostly fully assembled

  • SKF bearings came in! Pressed into P0116, has yet to be reassembled

  • Any other important updates (wink)

Blockers

  • Retaining rings for

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Finish assembly by Ssaturday

Drivetrain - High Level Goals

Active Goals

  • Assemble full drivetrain
  • Finish machining all wheel connection parts
  • Finish machining all chassis parts
  • Finish machining all differential parts
  • Finish qty 6 wheel connection assy.
  • Finish chassis assembly
  • Finish differential bar assembly
 Completed Goals
  • Move completed goals here when they are done.


Arm - Updates

Arm Integration

 Arm Integration Notes

Champions

Updates

  • Insert Updates

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Axis 1

 Axis 1 Notes

Champions

  • Ryan Mark //may attend meeting at 8:45 pm or not:( see updates below

Updates

  • Parts needed for assembly found and organized in blue “Axis 1” box (lots of parts for this axis - see combined pdf below!)

  • Missing some parts (see Blockers) so can’t do full build; will be able to do full assembly once all parts are found

Blockers

Weekly Retrospect

(link previous weeks updates here)

  • Machined part MR22-A1-P0040 for the axis (thought it was only part missing but it’s not:()
  • Other weeks machined MR22-A1-P0037/38 and completed ESMS Training

Weekly Targets

  • Talk to Ethan to see if two parts can be machined
  • Talk to Emily to see if parts are here or need to be re-ordered. Also, find where everything is

Axis 2

 Axis 2 Notes

Champions

Updates

  • Strainwave gearbox is in Thornhill, Ontario → can someone bring it to UW?

  • Assembly status

  • Is part tracker fully up to date?

  • Any other important updates (wink)

Blockers

  • Strainwave gearbox

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Axis 3

 Axis 3 Notes

Champions

Updates

  • @Zia Formuly is Machining P0061 (The stock is 3mm short)

  • Worked on A3 Assembly Drawing

  • Creating waterjet bounty for P0240 (Pressure Washer)

Blockers

  • Part 0062 is sponsor machined - currently sent to Demtool

Weekly Retrospect

Weekly Targets

  • Complete Machining
  • Begin Assembly

Axis 4

 Axis 4 Notes

Champions

Updates

  • Assembly status

    • Nothing assembled yet

  • Is part tracker fully up to date?

    • Yep

  • Any other important updates (wink)

    • Still Waiting on 244 (Matthew Zhu) and 246 (Kyle Ferrier)

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Axis 5/6

 Axis 5/6 Notes

Champions

Updates

  • Parts sent to Demtool (they said the CNCed part would take “some time”)

  • Started machining parts

  • Most other parts ready to machine (will send bounties soon)

  • One more drawing to make

Blockers

  • Waiting for Demtool parts

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

O-Drive Enclosures

 O-Drive Enclosure Notes

Champions

Updates

  • Is design for enclosures ready for review? → ready for an informal design review?

  • Is layout / location finalized?

  • Any other important updates (wink)

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Arm - High Level Goals

Active Goals

  • Assemble full arm
  • Finish fabricating all parts for Axis 1
  • Finish fabricating all parts for Axis 2
  • Finish fabricating all parts for Axis 3
  • Finish fabricating all parts for Axis 4
  • Finish fabricating all parts for Axis 5/6
  • Assemble Axis 1
  • Assemble Axis 2
  • Assemble Axis 3
  • Assemble Axis 4
  • Assemble Axis 5/6
  • Finish O-Drive enclosure design
  • Fabricate O-Drive enclosures
 Completed Goals
  • Move completed goals here


Science Updates

Science Integration

 Science Integration Notes

Champions

Updates

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Drill Bit Module

 Drill Bit Module Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Dirt Read Head Module

 Dirt Read Head Module Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Elevator Modules

 Elevator Module Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Test Tube Module

 Test Tube Module Notes

Champions

  • TBD

Updates

  • Still need to fix dirt delivery nozzles based on new dimensions of test tubes (also need to find all of the test tubes in the bay) - Gavin

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Base Frame

 Base Frame Notes

Champions

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

Science - High Level Goals

Active Goals

  • Assemble full science mechanism
  • Finish fabricating all parts for drill bit module
  • Finish fabricating all parts for dirt read head module
  • Finish fabricating all parts for elevator modules
  • Finish fabricating all parts for test tube module
  • Finish fabricating all parts for base frame
  • Assemble drill bit module
  • Assemble dirt read head module
  • Assemble elevator modules
  • Assemble test tube module
  • Assemble base frame
 Completed Goals
  • Move completed goals here


Electrical Box - Updates

 Electrical Box Notes

Champions

Updates

  • Ebox mounts - design finalized and printed?

  • New task - ebox layout! Austin Tailon Huang for more details

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Electrical Box - High Level Goals

Active Goals

  • Assemble electrical box on new chassis
  • Determine level of rework for electrical box
  • Verify fully enclosed mass
 Completed Goals
  • Move completed goals here


End Effector - Updates

 Gimbal Notes

Champions

  • TBD

Updates

  • Misumi parts incoming - stay posted!

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

End Effector - High Level Goals

Active Goals

  • Assemble end effector
 Completed Goals
  • Move completed goals here


Gimbal/Vision - Updates

 Gimbal Notes

Champions

Updates

  • Gimbal is in bay

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Wrist Camera

 Wrist Camera Notes

Champions

Updates

  • Wrist mount camera design finalized?

  • Has camera in bay been located / do you need help finding it?

  • Any other updates (wink)

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Gimbal/Vision - High Level Goals

Active Goals

  • Rework gimbal parts
  • Assemble reworked gimbal
  • Finish wrist camera mount design
  • Fabricate wrist camera
 Completed Goals
  • Move completed goals here


LED Matrix - Updates

 LED Matrix Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Assess state of current LED matrix (put owner)
  • Determine any necessary reworks to install on current rover (put owner)

LED Matrix - High Level Goals

Active Goals

  • Rework old LED matrix
  • Install LED matrix on new rover
 Completed Goals
  • Move completed goals here


Battery Mount - Updates

 Battery Mount Notes

Champions

Updates

  • Design finalized / ready for review?

  • Drawing status?

  • Stock sizes determined?

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Battery Mount - High Level Goals

Active Goals

  • Finalize design of new battery mount
  • Fabricate battery mount
  • Install battery mount on new rover
 Completed Goals
  • Move completed goals here


E-Stop - Updates

 E-Stop Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

E-Stop - High Level Goals

Active Goals

  • Install E-stop on rover
 Completed Goals
  • Move completed goals here


Comms - Updates

 Comms Tower (Rover)

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.
 Base Station

Champions

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  • Insert progression target for the week, with owner.

Comms - High Level Goals

Active Goals

  • Verify capabilities of comms station
  • Determine if antennae position rework is necessary
 Completed Goals
  • Move completed goals here


Other Updates

  • This section is free form. Please feel free to add any other updates you would like.

  • Max Apitz-Grossman : Mars Lander?

  • No labels