Versions Compared
compared with
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Due Date:
Contributor Log
Name | Contribution |
---|---|
Task Description
Clean and consolidate the fastener wall cabinets per the standard components in the cleaned PDM.
![](https://uwaterloo.atlassian.net/wiki/download/thumbnails/43185143814/image-20220829-194811.png?version=1&modificationDate=1661802502932&cacheVersion=1&api=v2&width=680)
Arrange other cabinets to accommodate the other common components, including bearings, stand-off, etc.
All the components stored in the cabinets must be standardized.
Task Breakdown
- Look into the common components in the cleaned CAD
- Investigate the common components in the vendors' store page (vendors including McMaster-Carr, EMS, etc.)
- List all the common components to be stored
- Create and propose a layout of the cabinets as to what will be stored where
- Clean and arrange the cabinets according to the created layout
Prerequisites
- CADs in PDM are cleaned (…link…)N/A
Progress Journal
Relevant Documentation Links
McMaster-Carr: https://www.mcmaster.com/
EMS-Store: https://ems-stores.uwaterloo.ca/ems-site/