Meeting Participants

Max Apitz-Grossman


General Announcements

  • Second hybrid meeting! Let’s see how this goes

  • Need to get everyone’s information in the member registry, and you guys need to sign it when you go to the bay next

  • Add yourselves to the participants list when you can

  • Please put tools back in their proper spots when your done!

  • Maybe no more hybrid meetings for now (tongue) too chaotic w/o a proper room booked

    • Alt: speaker in the bay, people read off of their own laptops


Drivetrain - Updates

Drivetrain Integration

Expand
titleDrivetrain Integration Notes

Champions

Updates

Blockers

  • Minor parts need to get remade on gimbal plate and chassis

  • Issues with MR22-DT-A0030 assembly

Weekly Retrospect

  •  Finish drivetrain assembly

Weekly Targets

  •  Address all issues with A0030 assembly, have a plan of action by
  •  

Wheel Connection

Expand
titleWheel Connection Notes

Champions

Updates

  • Didn’t start printing the hubs yet

    • wanted to make sure there’s enough clearance between wheel hub and bracket before mass printing

  • Printing tolerance hell → P0112 is too constrained in inner diameter and inner height

  • Bearing does not sit flush in P0106 → bearing height in CAD model is not accurate to the datasheet, P0108 constrained to heavily

Blockers

  • Need wheel hub prints to finish wheel connection

  • Problems with P0106

Weekly Retrospect

Weekly Targets

  •  Resolve issues with fitting the bearing into the assembly, assembling gearboxes to P0106
  •  Assemble encoders onto gearboxes
  •  Finish motor mounting assembly Emily Adam
  •  Print spacers, P0287, P0288 Asha Mills Emmett,
  •  Update wheel hubs to be for 1/4”-20 fasteners Asha Mills Emmett
  •  Modify and update the wheel hubs to accommodate new parts

Chassis

Expand
titleChassis Notes

Champions

Updates

  • Cleaned up the chassis folder

Blockers

  • Waterjet plate on top of comms stand needs to get reworked and waterjet, current size is too large

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

Differential Bar

Expand
titleDifferential Bar Notes

Champions

Updates

  • Machined new P0028’s

Blockers

Weekly Retrospect

  •  Have fully assembled Emily Adam
  •  Pick up purchased stock for MR22-DT-P0035 → Emily Adam
  •  Machine MR22-DT-P0035 → Emily Adam

Weekly Targets

  • Assemble fully next build session Emily Adam

  • Verify that assemble has no issues Emily Adam

  • Finish P0028 (tap remaining two holes, with RH thread for now) Emily Adam

Suspension

Expand
titleSuspension Notes

Champions

Updates

  • Suspension assembly completed

Blockers

  • N/A

Weekly Retrospect

Weekly Targets

  •  Create tracking page for build notes/observations (investigate why one side is more rigid than the other) Max Apitz-Grossman
  •  Add spacer for messed up P0106 side → Emily Adam

Drivetrain - High Level Goals

Active Goals

  •  Assemble full drivetrain
  •  Finish printing all wheel connection parts
  •  Finish machining all chassis parts
  •  Finish machining all differential parts
  •  Finish qty 6 wheel connection assy.
  •  Finish differential bar assembly
Expand
titleCompleted Goals
  •  Finish chassis assembly
  •  Finish suspension assembly

Drivetrain - Known Issues

  •  

Arm - Updates

Arm Integration

Expand
titleArm Integration Notes

Champions

Updates

  • OTS Fasteners, Misumi, Demtool, stock parts should all be in bay → everything ready to get things assembled

Blockers

  • Assigned members have been focusing on drivetrain assembly and midterms for the past week

Weekly Retrospect

Weekly Targets

Axis 1

Expand
titleAxis 1 Notes

Champions

Updates

  • Talked to Austin to discuss assembly and steps to build it

  • Will use epoxy (first part of assembly) hopefully at week's end once I finished machining a part (machine shop lathes occupied last week)

Blockers

Weekly Retrospect

(link previous weeks updates here)

  •  Machined part MR22-A1-P0040 for the axis
  •  Other weeks machined MR22-A1-P0037/38 and completed ESMS Training
  •  Talk to Austin to see if two parts can be machined Austin Tailon HuangRyan Mark
  •  Touch base with Austin to figure out what fasteners were replaced Austin Tailon HuangRyan Mark

Weekly Targets

  •  Manufacture remaining Axis 1 parts Ryan Mark
  •  Confirm status of remaining OTS parts Ryan Mark
  •  Start assembly Ryan Mark

Axis 2

Expand
titleAxis 2 Notes

Champions

Updates

  • Talked with austin about getting the parts needed

  • Trouble finding stuff

Blockers

  • Midterms prevented work on the past week

Weekly Retrospect

Weekly Targets

Axis 3

Expand
titleAxis 3 Notes

Champions

Updates

  • Started assembly, found fasteners

Blockers

Weekly Retrospect

Weekly Targets

Axis 4

Expand
titleAxis 4 Notes

Champions

Updates

  • Started assembly and will continue it over this week (all parts finished)

Blockers

  • No significant blockers other than usual schoolwork

  • Missing hex head screws for assembly 12 (McMaster: 91280A121 and 91280A116) Max Apitz-Grossman add to order

Weekly Retrospect

  •  Assembly going smoothly, nothing bad happening yet
  •  Wondering if the MAXON motor and encoder are in the MAXON box. The part numbers don’t match up on BOM but it looks the same as the assembly

Weekly Targets

  •  Finish assembly 12 and start assembly 48 (48 is top of below and 12 is bottom)
  •  Possibly order hex screws from EMS
  •  Check to see if we have all required OTS parts ordered and in the bay Austin Tailon Huang (Started Mar 8)

Axis 5/6

Expand
titleAxis 5/6 Notes

Champions

Updates

  • Waiting on a few parts to be CNC’d

  • Machining the rest of the parts this week

Blockers

  • Demtool part will take the longest probably - maybe CNC in house??

    • ESMS guys will do it for us next week

Weekly Retrospect

  •  Make P0080 drawing Charmaine Chun
  •  Determine if we can machine CNC’d parts in house Medina Colabrese
  •  Machine some stuff → add specifics as bounties are posted
  •  Order boxtube Medina Colabrese

Weekly Targets

  •  Order stock for MR22-A56-P0115A → Emily Adam
  •  Assemble the back half of Axis 5/6

O-Drive Enclosures

Expand
titleO-Drive Enclosure Notes

Champions

Updates

  • Still working on discussed changes

Blockers

  • No blockers

Weekly Retrospect

Weekly Targets

  •  Integrate feedback from design review Thomas Valer
  •  Final review once changes are made

IntegArm - High Level Goals

Active Goals

  •  Assemble full arm
  •  Finish fabricating all parts for Axis 1
  •  Finish fabricating all parts for Axis 2
  •  Finish fabricating all parts for Axis 3
  •  Finish fabricating all parts for Axis 4
  •  Finish fabricating all parts for Axis 5/6
  •  Assemble Axis 1
  •  Assemble Axis 2
  •  Assemble Axis 3
  •  Assemble Axis 4
  •  Assemble Axis 5/6
  •  Finish O-Drive enclosure design
  •  Fabricate O-Drive enclosures
Expand
titleCompleted Goals
  • Move completed goals here

Arm Known Issues


Science Updates

Science Integration

Expand
titleScience Integration Notes

Champions

Updates

  • Assigning members to be various task champions

Blockers

  • Fastener ordering, including some the ems store doesn’t carry

  • Still need some champions

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  assembly drawings done by end of week
  •  all ems fasteners ordered, going to hold back on mcmaster/other sources for the niche bolts until we have more to order

Drill Bit Module

Expand
titleDrill Bit Module Notes

Champions

  • Zia Formuly

Updates

  • Beginning this week

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

Dirt Read Head Module

Expand
titleDirt Read Head Module Notes

Champions

  • Ronald

Updates

  • Creating configurations/display states

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.

Elevator Modules

Expand
titleElevator Module Notes

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.

Test Tube Module

Expand
titleTest Tube Module Notes

Champions

  • TBD

Updates

  • Still need to fix dirt delivery nozzles based on new dimensions of test tubes (also need to find all of the test tubes in the bay) Gavin Mesz

    • nozzles need 3D print prototypes to test fit new o-ring

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.

Base Frame

Expand
titleBase Frame Notes

Champions

  • Taim?

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Create drawings for all t-slot extrusion sub-assemblies

Science - High Level Goals

Active Goals

  •  Assemble full science mechanism
  •  Finish fabricating all parts for drill bit module
  •  Finish fabricating all parts for dirt read head module
  •  Finish fabricating all parts for elevator modules
  •  Finish fabricating all parts for test tube module
  •  Finish fabricating all parts for base frame
  •  Assemble drill bit module
  •  Assemble dirt read head module
  •  Assemble elevator modules
  •  Assemble test tube module
  •  Assemble base frame
Expand
titleCompleted Goals
  • Move completed goals here

Science - Known Issues


Electrical Box - Updates

Expand
titleElectrical Box Notes

Champions

Updates

  • New task - ebox layout! Austin Tailon Huang for more details

  • Model finished - just needs to be printed

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

Electrical Box - High Level Goals

Active Goals

  •  Assemble electrical box on new chassis
  •  Determine level of rework for electrical box
  •  Verify fully enclosed mass
Expand
titleCompleted Goals
  • Move completed goals here


End Effector - Updates

Expand
titleGimbal Notes

Champions

  • @zia formuly

Updates

  • Current state of gripper:

    • one part from KHK missing still → being worked on

    • needs encoder bolted to the back

    • Then done

Blockers

  • No current blockers

Weekly Retrospect

(link previous weeks updates here)

Weekly Targets

  •  Assemble the gripper @zia formuly

End Effector - High Level Goals

Active Goals

  •  Assemble end effector
Expand
titleCompleted Goals
  • Move completed goals here


Gimbal/Vision - Updates

Expand
titleGimbal Notes

Champions

Updates

  • Still gathering info before I start the design

  • Unrelated but Asha reminded me to add print tolerance configurations to 3d printed science mounts

Blockers

  • Need to know more about what goes on comm stand

Weekly Retrospect

  •  

Weekly Targets

Wrist Camera

Expand
titleWrist Camera Notes

Champions

Updates

  • Wrist mount camera design is finalized!

  • Any other updates(wink)

Blockers

  • Insert blockers here

Weekly Retrospect

  •  

Weekly Targets

Gimbal/Vision - High Level Goals

Active Goals

  •  Rework gimbal parts
  •  Assemble reworked gimbal
  •  Finish wrist camera mount design
  •  Fabricate wrist camera
Expand
titleCompleted Goals
  • Move completed goals here


LED Matrix - Updates

Expand
titleLED Matrix Notes

Champions

  • Olivia Zheng

Updates

  • Digging up information about where and how it was mounted in the past

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Assess state of current LED matrix (put owner)
  •  Determine any necessary reworks to install on current rover (put owner)

LED Matrix - High Level Goals

Active Goals

  •  Rework old LED matrix
  •  Install LED matrix on new rover
Expand
titleCompleted Goals
  • Move completed goals here


Battery Mount - Updates

Expand
titleBattery Mount Notes

Champions

Updates

  • Design finalized - ready to machine

Blockers

  • Insert blockers here

Weekly Retrospect

  •  

Weekly Targets

Battery Mount - High Level Goals

Active Goals

  •  Finalize design of new battery mount
  •  Fabricate battery mount
  •  Install battery mount on new rover
Expand
titleCompleted Goals
  • Move completed goals here


E-Stop - Updates

Expand
titleE-Stop Notes

Champions

Updates

  • Cad is done

  • 3D printed

Blockers

  • I ordered the wrong bolts from EMS

Weekly Retrospect

  •  

Weekly Targets

  •  get bolts

E-Stop - High Level Goals

Active Goals

  •  Install E-stop on rover
Expand
titleCompleted Goals
  • Move completed goals here


Comms - Updates

Expand
titleComms Tower (Rover)

Champions

  • TBD

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.
Expand
titleBase Station

Champions

Updates

  • Insert updates here

Blockers

  • Insert blockers here

Weekly Retrospect

(link previous weeks updates here)

  •  

Weekly Targets

  •  Insert progression target for the week, with owner.

Comms - High Level Goals

Active Goals

  •  Verify capabilities of comms station
  •  Determine if antennae position rework is necessary
Expand
titleCompleted Goals
  • Move completed goals here


Other Updates

NEW TASKS:

Roles to be assigned:

  • Science: Elevator Module

  • Science: Test Tube Module

  • Comms. verification + potential rework