Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Wheel integration!!!
    • To do ASAP!
      • Get more detail on the inner fillet of the wheel so that we have more information on the constraining area
      • Print the current wheel hub and test ASAP 
      • Consider alternative methods, such as adapting the original hub → Asha Mills Emmett
  • Prototype bonding aluminum hubs to the carbon fibre
    • Verify choice of epoxy
    • Verify successful establishment of the bond gap between the aluminum and carbon fibre
    • Verify by testing the strength of the carbon fibre assembly after bonding using the Department's equipment
    • To do ASAP!: 
      • Buy bonding materials from Composites Canada
      • Get a cap machined
        • Add bonding step 
      • Develop a test plan and establish what we are specifically looking for (Instron?)
    • Questions:
      • How much material do we have left? → Chanpakorn Chaiklahan
      • Approximately 3 ft., enough for another test.
  • FEA!!! → Andrew Tersigni (Deactivated)
  • Smaller CAD updates
    • Refer to the review's meeting minutes for specific feedback on each sub-system
    • General feedback:
      • Reduce the amount of hardware needed → PEM nuts, flange bolts, reduce overkill of mounting locations, remove unnecessary 3D printed parts
      • Reduce areas of stress concentration!
      • Verify machinability with Demtool's guidelines

...