Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Preliminary Architecture design

Functional architecture

Top level Vehicle

Overall Requirement statements, Generated by project stakeholders (This still needs to take place):

...

2.0. Vehicle should stay in constant communication [of telemetry] w/ ground through ConOPS stages 2-10.

3.0 Stable throughout flights

3.1 > 100 ft/s Off the rail velocity

3.2 1.5 to 6 caliber - depends on wind condition constraint - Should be double checked

4.0 Vehicle should be structurally sound throughout the flight

5.0

ConOPS Stages

These are the distinct states of rocket

...