PDR Two
Constraints
The mounting position should not interfere with the arm or minimum ground clearance
must be 26.9 x 17 x 17 cm to fit the battery and bag
Criteria
Minimizes moments on the differential bar; ensures that the chassis is balanced
This affects the CG height and the CG proximity to the differential bar. THis will also be dependant on the device mounted to the front of the rover
allowing for ease of wiring from the ebox to other parts of the rover such as the arm?
This will require collaboration with the Ebox placement.
Protects battery from being hit or impacted by elements such as rocks or other debris under the rover
Design Concepts
Mitigate Rist
Spacing can be checked within the cad model and additional alterations can be made to ensure ebox and battery both fit
The COM can be determined using cad
Trade-Offs
CG (height)
CG (Proximity to the differential bar)
Ebox accessibility, wiring ability, and ability to access ports
Interference with coms if places near them
Timeline
the part should be manufactured by the end of the term
the design will be reviewed and work can start on the can model by the end of the week (November 11)
Resources
Stock, probably a plate that can be shaped, or multiple plates assembled together with connectors
machine shop