Attendants

  • Ethan

Mechanical

Drivetrain

  • How many parts left to fabricate?

  • Most parts Machined!

  • Looseness with tubes?

  • assembly drawings?

  • Agile?

  • Demtool?

  • When is assembly occuring?

  • What is being blocked


Arm

  • machining?

    • who is maching

    • what needs to be machined (priority)

  • What is the plan with the Gearbox?

  • Maxon motors arrived!


Gimbal

  • overall update?


Science

  • Problem with test tube

    • Gavin is sorting it out

  • Rest of bom to fabricate

  • CPI Automation stuff on its way? 1-2 more weeks till stuff should be here

  • Servo City stuff ordered?

  • needs assy drawings (several)

  • needs cut length drawing


Gripper

  • 1 part left to fabricate

  • pending Misumi Parts

  • pending Assembly

  • Use of random encoder

  • Send to firmware team

  • needs assy drawing (1)


Orders

  • What stuff is ordered and when will it arrive (estimate)

    • CPI Automation stuff: 1-2 weeks from now

Electrical

  • Status on boards

    • science board?

  • wiring diagram - should be done by now

  • 12awg/8awg purchased yet?

  • battery charger selected! - borrow from graeme

  • comms tested?

  • SPI Master board finished?

  • PDM and RS422 ordered?

Firmware

  • firmware suitable for broadcoms?

  • odrive motor controller tested?

  • missing blackfly found?

  • motor fixture made yet?

Software

  • Arm Progress? - testable?

  • CAN API progress?

  • Time to work on science yet?

Science

  • Has Ninhydrin test been documented?

  • Has experimental procedure been documented?

  • Physical testing?

  • SDS sheets?

Business

STAR GOALS

Specific, Testable, Attainable, Relevant

Mechanical

Electrical

Firmware

Software

Science

Leads

General

  • Safety Captain?

  • Battery over boarder?

  • RLS Encoders

  • No labels